Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Plug flow type sewage treatment construction process
The invention relates to the technical field of sewage treatment, in particular to a plug flow type sewage treatment construction process. The plug flow type sewage treatment construction process comprises the following steps that S1, a foundation pit is dug; S2, substrate treatment is carried out; S3, a leveling layer is laid; S4, a sewage treatment tank is poured; S5, pipelines are laid; S6, the sewage treatment tank is reinforced; S7, the foundation pit is backfilled; and S8, equipment is mounted. According to the plug flow type sewage treatment construction process, the construction process is simple, the substrate and enclosing walls can play a good role in protecting the sewage treatment tank, and the sewage treatment tank is high in stability, durable, reliable and convenient to use and popularize.
本发明涉及污水处理技术领域,尤其涉及一种推流式污水处理施工工艺,包括以下步骤:S1、挖基坑;S2、基底处理;S3、铺设找平层;S4、浇注污水处理池;S5、铺设管道;S6、污水处理池加固;S7、基坑回填;S8、设备安装,通过该施工工艺建设的推流式污水处理设施,其施工工艺简单,且基底和围墙能够对污水处理池起到很好的防护作用,污水处理池的稳定性高,耐用可靠,便于推广使用。
Plug flow type sewage treatment construction process
The invention relates to the technical field of sewage treatment, in particular to a plug flow type sewage treatment construction process. The plug flow type sewage treatment construction process comprises the following steps that S1, a foundation pit is dug; S2, substrate treatment is carried out; S3, a leveling layer is laid; S4, a sewage treatment tank is poured; S5, pipelines are laid; S6, the sewage treatment tank is reinforced; S7, the foundation pit is backfilled; and S8, equipment is mounted. According to the plug flow type sewage treatment construction process, the construction process is simple, the substrate and enclosing walls can play a good role in protecting the sewage treatment tank, and the sewage treatment tank is high in stability, durable, reliable and convenient to use and popularize.
本发明涉及污水处理技术领域,尤其涉及一种推流式污水处理施工工艺,包括以下步骤:S1、挖基坑;S2、基底处理;S3、铺设找平层;S4、浇注污水处理池;S5、铺设管道;S6、污水处理池加固;S7、基坑回填;S8、设备安装,通过该施工工艺建设的推流式污水处理设施,其施工工艺简单,且基底和围墙能够对污水处理池起到很好的防护作用,污水处理池的稳定性高,耐用可靠,便于推广使用。
Plug flow type sewage treatment construction process
一种推流式污水处理施工工艺
WU JIAN (Autor:in) / WANG MEIXIANG (Autor:in) / WANG XINFENG (Autor:in) / JIANG YOUCHENG (Autor:in)
10.08.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
C02F
Behandlung von Wasser, Schmutzwasser, Abwasser oder von Abwasserschlamm
,
TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
/
E02D
FOUNDATIONS
,
Gründungen
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Divided-flow type vertical sludge and sewage treatment system and treatment process
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|