Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete structure connecting joint with sliding support
The invention belongs to the technical field of building construction and particularly discloses a concrete structure connecting joint with a sliding support. The concrete structure connecting joint with a sliding support is arranged between a concrete member I and a concrete member II, the concrete member I is positioned above the concrete member II, a first embedded part is embedded in a bottom part of the concrete member I, a second embedded part right opposite to the first embedded part is embedded in a top part of the concrete member II, and a rubber support is arranged between the first embedded part and the second embedded part. By using the scheme, the first embedded part, the second embedded part and the rubber support form a combination of brand new connecting members from top to bottom. A problem of connection between the independent concrete members is solved and adverse effects caused by relative displacement between the members are relieved. An adverse effect caused by size errors generated in a pouring forming process of the concrete members is relieved.
本发明属于建筑施工技术领域,具体公开了一种带有滑动支座的混凝土结构连接节点,设置在混凝土构件Ⅰ和混凝土构件Ⅱ之间,混凝土构件Ⅰ位于混凝土构件Ⅱ的上方,其所述混凝土构件Ⅰ底部埋有第一预埋件,所述混凝土构件Ⅱ顶部埋有与第一预埋件正对的第二预埋件,所述第一预埋件与第二预埋件之间设有橡胶支座。采用本发明的方案,使第一预埋件、第二预埋件以及橡胶支座自上而下形成的全新连接构件的组合。解决了独立混凝土构件之间的连接问题,缓解了构件之间相对位移带来的不利影响。减轻了混凝土构件在浇筑成型过程中产生的尺寸误差带来的不利影响。
Concrete structure connecting joint with sliding support
The invention belongs to the technical field of building construction and particularly discloses a concrete structure connecting joint with a sliding support. The concrete structure connecting joint with a sliding support is arranged between a concrete member I and a concrete member II, the concrete member I is positioned above the concrete member II, a first embedded part is embedded in a bottom part of the concrete member I, a second embedded part right opposite to the first embedded part is embedded in a top part of the concrete member II, and a rubber support is arranged between the first embedded part and the second embedded part. By using the scheme, the first embedded part, the second embedded part and the rubber support form a combination of brand new connecting members from top to bottom. A problem of connection between the independent concrete members is solved and adverse effects caused by relative displacement between the members are relieved. An adverse effect caused by size errors generated in a pouring forming process of the concrete members is relieved.
本发明属于建筑施工技术领域,具体公开了一种带有滑动支座的混凝土结构连接节点,设置在混凝土构件Ⅰ和混凝土构件Ⅱ之间,混凝土构件Ⅰ位于混凝土构件Ⅱ的上方,其所述混凝土构件Ⅰ底部埋有第一预埋件,所述混凝土构件Ⅱ顶部埋有与第一预埋件正对的第二预埋件,所述第一预埋件与第二预埋件之间设有橡胶支座。采用本发明的方案,使第一预埋件、第二预埋件以及橡胶支座自上而下形成的全新连接构件的组合。解决了独立混凝土构件之间的连接问题,缓解了构件之间相对位移带来的不利影响。减轻了混凝土构件在浇筑成型过程中产生的尺寸误差带来的不利影响。
Concrete structure connecting joint with sliding support
一种带有滑动支座的混凝土结构连接节点
KONG HANYU (Autor:in) / HE XING (Autor:in) / CHEN DING (Autor:in) / TAN JIANGUO (Autor:in) / JI JUNHONG (Autor:in) / AI JINGSONG (Autor:in) / LIU YUAN (Autor:in) / LU AIMIN (Autor:in) / WEN CHUAN (Autor:in) / WEN SHENGQIN (Autor:in)
13.08.2021
Patent
Elektronische Ressource
Chinesisch
Foundation pit concrete support connecting joint structure, concrete support and construction method
Europäisches Patentamt | 2024
|Top beam and concrete support connecting joint construction method and joint structure
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|Europäisches Patentamt | 2020
|Sliding connecting joint of steel structure beam column
Europäisches Patentamt | 2015
|