Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Combined snowflake type pile foundation construction system and construction method
The invention discloses a combined snowflake type pile foundation construction system and a construction method. The pile foundation construction system comprises a combined snowflake type pile foundation and construction equipment, wherein the combined snowflake type pile foundation comprises a snowflake type concrete steel sheet pile and a powder spraying pile; the snowflake type concrete steel sheet pile is pressed into the powder spraying pile under the action of the construction equipment; the construction equipment comprises a base and an operation device; the operation device comprises a plurality of positioning locking devices, a manual operation system, a two-dimensional code remote operation system, a computer remote operation system and an operation system control center; the positioning locking devices are used for positioning the snowflake type concrete steel sheet pile; and the operation system control center is used for converting the manual operation system, the two-dimensional code remote operation system and the computer remote operation system so as to control the locking sizes of the positioning locking devices and the height of the construction equipment. According to the combined snowflake type pile foundation construction system and the construction method, the perpendicularity of a pile body is guaranteed when the snowflake type concrete steel sheet pile is sunk into the powder spraying pile, and the horizontal ultimate bearing capacity of the combined snowflake type pile foundation is improved.
本发明公开了一种组合式雪花型桩基础施工系统及施工方法,该桩基础施工系统包括组合式雪花型桩基础和施工设备;组合式雪花型桩基础包括雪花型混凝土钢板桩和粉喷桩,雪花型混凝土钢板桩在施工设备的作用下压入粉喷桩;施工设备包括底座和操作装置;操作装置包括多个定位锁紧装置、手动操作系统、二维码远程操作系统、电脑远程操作系统和操作系统控制中枢;定位锁紧装置对雪花型混凝土钢板桩定位;操作系统控制中枢对手动操作系统、二维码远程操作系统和电脑远程操作系统进行转换以对定位锁紧装置的锁紧尺寸和施工设备的高度进行控制。本发明确保了在将雪花型混凝土钢板桩沉入粉喷桩时桩身的垂直度,提高了组合式雪花型桩基础的水平极限承载力。
Combined snowflake type pile foundation construction system and construction method
The invention discloses a combined snowflake type pile foundation construction system and a construction method. The pile foundation construction system comprises a combined snowflake type pile foundation and construction equipment, wherein the combined snowflake type pile foundation comprises a snowflake type concrete steel sheet pile and a powder spraying pile; the snowflake type concrete steel sheet pile is pressed into the powder spraying pile under the action of the construction equipment; the construction equipment comprises a base and an operation device; the operation device comprises a plurality of positioning locking devices, a manual operation system, a two-dimensional code remote operation system, a computer remote operation system and an operation system control center; the positioning locking devices are used for positioning the snowflake type concrete steel sheet pile; and the operation system control center is used for converting the manual operation system, the two-dimensional code remote operation system and the computer remote operation system so as to control the locking sizes of the positioning locking devices and the height of the construction equipment. According to the combined snowflake type pile foundation construction system and the construction method, the perpendicularity of a pile body is guaranteed when the snowflake type concrete steel sheet pile is sunk into the powder spraying pile, and the horizontal ultimate bearing capacity of the combined snowflake type pile foundation is improved.
本发明公开了一种组合式雪花型桩基础施工系统及施工方法,该桩基础施工系统包括组合式雪花型桩基础和施工设备;组合式雪花型桩基础包括雪花型混凝土钢板桩和粉喷桩,雪花型混凝土钢板桩在施工设备的作用下压入粉喷桩;施工设备包括底座和操作装置;操作装置包括多个定位锁紧装置、手动操作系统、二维码远程操作系统、电脑远程操作系统和操作系统控制中枢;定位锁紧装置对雪花型混凝土钢板桩定位;操作系统控制中枢对手动操作系统、二维码远程操作系统和电脑远程操作系统进行转换以对定位锁紧装置的锁紧尺寸和施工设备的高度进行控制。本发明确保了在将雪花型混凝土钢板桩沉入粉喷桩时桩身的垂直度,提高了组合式雪花型桩基础的水平极限承载力。
Combined snowflake type pile foundation construction system and construction method
一种组合式雪花型桩基础施工系统及施工方法
QIAN JIBEN (Autor:in) / GAO LEI (Autor:in) / XU ZHONGQUAN (Autor:in) / ZHANG JUNWEI (Autor:in) / QIAN MINHAO (Autor:in) / CHEN XIAOCUN (Autor:in) / WANG QIN (Autor:in) / GUO MENGRAN (Autor:in)
17.08.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2015
|Pile foundation construction platform and pile foundation construction method
Europäisches Patentamt | 2020
|Construction method of combined assembly type deep foundation pile
Europäisches Patentamt | 2021
|Pile foundation construction platform and pile foundation construction method
Europäisches Patentamt | 2024
|