Salt lake area power transmission line iron tower foundation construction method
The invention belongs to the technical field of power transmission line iron tower foundation design, and particularly relates to a salt lake area power transmission line iron tower foundation construction method. The construction method comprises the following steps that S1, a foundation pit is excavated, and the foundation pit is treated in a composite foundation treatment mode; S2, a foundation structure is optimized, a primary beam structure and a secondary beam structure are added on a foundation bottom plate, and the foundation structure is designed into an integral foundation type; S3, glass fiber reinforced plastics are adopted for carrying out wrapping anti-corrosion treatment on all parts of the foundation structure; S4, soil covering treatment is conducted on the foundation pit, and protection treatment is conducted on a tower footing slope; and S5, waterproof treatment is conducted on the base face of the tower footing. The method systematically solves the problems of foundation instability and salinized soil corrosion of the power transmission line iron tower in the salt lake area, ensures safe and stable operation of the power transmission line, and has important significance for improving the economical efficiency and the safe stability of industrial production in a salt lake mining area and promoting sustainable and healthy development of the industrial production in the salt lake area.
本发明属于输电线路铁塔基础设计技术领域,尤其涉及一种盐湖区输电线路铁塔基础施工方法,包括以下步骤:步骤1:开挖基坑,采用复合地基处理方式对基坑进行处理;步骤2:优化基础结构,在基础底板上增加主次梁结构,将基础结构设计成整体基础型式;步骤3:采用玻璃钢对基础结构各部位进行包裹防腐处理;步骤4:对基坑进行覆土处理,并对塔基边坡做防护处理;步骤5:对塔基基面进行防水处理。本发明方法系统性解决盐湖区输电线路铁塔基础失稳及盐渍土腐蚀,确保输电线路安全稳定运行,对于提高盐湖采矿区工业生产的经济性和安全稳定性,促进盐湖地区工业生产持续健康发展具有重要意义。
Salt lake area power transmission line iron tower foundation construction method
The invention belongs to the technical field of power transmission line iron tower foundation design, and particularly relates to a salt lake area power transmission line iron tower foundation construction method. The construction method comprises the following steps that S1, a foundation pit is excavated, and the foundation pit is treated in a composite foundation treatment mode; S2, a foundation structure is optimized, a primary beam structure and a secondary beam structure are added on a foundation bottom plate, and the foundation structure is designed into an integral foundation type; S3, glass fiber reinforced plastics are adopted for carrying out wrapping anti-corrosion treatment on all parts of the foundation structure; S4, soil covering treatment is conducted on the foundation pit, and protection treatment is conducted on a tower footing slope; and S5, waterproof treatment is conducted on the base face of the tower footing. The method systematically solves the problems of foundation instability and salinized soil corrosion of the power transmission line iron tower in the salt lake area, ensures safe and stable operation of the power transmission line, and has important significance for improving the economical efficiency and the safe stability of industrial production in a salt lake mining area and promoting sustainable and healthy development of the industrial production in the salt lake area.
本发明属于输电线路铁塔基础设计技术领域,尤其涉及一种盐湖区输电线路铁塔基础施工方法,包括以下步骤:步骤1:开挖基坑,采用复合地基处理方式对基坑进行处理;步骤2:优化基础结构,在基础底板上增加主次梁结构,将基础结构设计成整体基础型式;步骤3:采用玻璃钢对基础结构各部位进行包裹防腐处理;步骤4:对基坑进行覆土处理,并对塔基边坡做防护处理;步骤5:对塔基基面进行防水处理。本发明方法系统性解决盐湖区输电线路铁塔基础失稳及盐渍土腐蚀,确保输电线路安全稳定运行,对于提高盐湖采矿区工业生产的经济性和安全稳定性,促进盐湖地区工业生产持续健康发展具有重要意义。
Salt lake area power transmission line iron tower foundation construction method
一种盐湖区输电线路铁塔基础施工方法
YAO GUOHE (Autor:in) / TAN QINGHAI (Autor:in) / DONG TIEZHU (Autor:in) / LIU YUPING (Autor:in) / ZHANG BINGLAI (Autor:in) / WANG HONGXUAN (Autor:in) / YE HAIJIN (Autor:in) / HU FAHONG (Autor:in) / HUANG CHUNLING (Autor:in) / JIAO JINGTAO (Autor:in)
24.08.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Power transmission line iron tower foundation construction method
Europäisches Patentamt | 2023
|Mountainous area power transmission line iron tower foundation construction equipment and method
Europäisches Patentamt | 2023
|Plateau area power iron tower foundation construction method
Europäisches Patentamt | 2021
|Power transmission line tower foundation and construction method
Europäisches Patentamt | 2023
|Novel power transmission line iron tower pile foundation
Europäisches Patentamt | 2024
|