Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the field of flood control systems, in particular to a power flood control system. The power flood control system comprises the steps that S1, a power flood control machine is arranged under the water surface of a river corner and a barrier, a pressure pipeline is laid under the water surface, a power water pump is arranged and connected with the power flood control machine, and power of the water pump is used for forcibly draining water; S2, a power flood control machine is arranged below a bridge, part of river water flow is guided to the other side of the bridge by starting the power flood control machine, and the impact force of flood on the bridge is reduced; and S3, culvert waterways for road flood control are arranged on the inner side and the outer side of a river, culverts for road flood control can be switched into the flood control function to close the road function, and the redundant flood is discharged to the downstream of the river through the river corner when the flood comes into the river and the redundant flood cannot be discharged.
本发明涉及防洪系统领域,具体为一种动力防洪系统,包括步骤1:江河拐弯、阻碍处水面下设置动力防洪机,动力防洪机为在水面以下修铺设条压力管道,再装设动力水泵一台与之连接,运用水泵的动力強行排水,进行加速下泄量从而减轻拐弯、遇阻江河段的行洪压力,步骤2:在桥梁下方设置动力防洪机,通过开启动力防洪机,将部份江河水流引向桥梁另一侧。减轻洪水对桥梁的冲击力。步骤3:在江河内、外侧设置有公路防洪两用的涵洞水路,当洪水来临江河内无法将多余的洪水排出时,能通过将公路防洪两用的涵洞切换成防洪功能关闭公路功能,将多余的洪水(绕)过江河拐弯处排至江河下游。
The invention relates to the field of flood control systems, in particular to a power flood control system. The power flood control system comprises the steps that S1, a power flood control machine is arranged under the water surface of a river corner and a barrier, a pressure pipeline is laid under the water surface, a power water pump is arranged and connected with the power flood control machine, and power of the water pump is used for forcibly draining water; S2, a power flood control machine is arranged below a bridge, part of river water flow is guided to the other side of the bridge by starting the power flood control machine, and the impact force of flood on the bridge is reduced; and S3, culvert waterways for road flood control are arranged on the inner side and the outer side of a river, culverts for road flood control can be switched into the flood control function to close the road function, and the redundant flood is discharged to the downstream of the river through the river corner when the flood comes into the river and the redundant flood cannot be discharged.
本发明涉及防洪系统领域,具体为一种动力防洪系统,包括步骤1:江河拐弯、阻碍处水面下设置动力防洪机,动力防洪机为在水面以下修铺设条压力管道,再装设动力水泵一台与之连接,运用水泵的动力強行排水,进行加速下泄量从而减轻拐弯、遇阻江河段的行洪压力,步骤2:在桥梁下方设置动力防洪机,通过开启动力防洪机,将部份江河水流引向桥梁另一侧。减轻洪水对桥梁的冲击力。步骤3:在江河内、外侧设置有公路防洪两用的涵洞水路,当洪水来临江河内无法将多余的洪水排出时,能通过将公路防洪两用的涵洞切换成防洪功能关闭公路功能,将多余的洪水(绕)过江河拐弯处排至江河下游。
Power flood control system
一种动力防洪系统
GU SHENGBIAO (Autor:in)
27.08.2021
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|