Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Robot ground digging structure
The invention relates to a robot ground digging structure which comprises a mounting support and a digging unit, and the digging unit is fixedly arranged on the lower surface of the mounting support. The problems that existing digging equipment is of a single working structure, when a worker holds the digging equipment by hand to work, large labor intensity is brought to the worker, and meanwhile the digging treatment efficiency of a damaged road surface is reduced can be solved; when the road surface is damaged, the position cannot be automatically moved and can be orderly carried out with the assistance of manpower, and the digging range of the digging equipment cannot be correspondingly adjusted according to the damaged region of the road surface; in the prior art, no corresponding protection facility is arranged, stone splashing can be caused in the digging process of digging equipment, workers are prone to being injured, and too much labor amount is brought to the workers due to the fact that dug road surface waste cannot be better collected and treated.
本发明涉及一种机器人开凿地面结构,包括安装支座与开凿单元,所述安装支座下表面设置固定设置有开凿单元。本发明可以解决目前存在的问题:现有的开凿设备为单体工作结构,在工人手持开凿设备进行工作时,会给工人带来较大劳动强度的同时,还会使得破损路面的开凿处理效率下降;无法自动的进行位置移动,还需要人力的辅助才能有序进行,而且无法根据路面的破损面积对开凿设备所开凿的范围进行相应的调整;没有设置相应的防护设施,而开凿设备开凿过程会造成石子的飞溅,不仅容易造成工人受伤,还会造成开凿下来的路面废料无法更好的进行收集处理,给工人带来过多的劳动量。
Robot ground digging structure
The invention relates to a robot ground digging structure which comprises a mounting support and a digging unit, and the digging unit is fixedly arranged on the lower surface of the mounting support. The problems that existing digging equipment is of a single working structure, when a worker holds the digging equipment by hand to work, large labor intensity is brought to the worker, and meanwhile the digging treatment efficiency of a damaged road surface is reduced can be solved; when the road surface is damaged, the position cannot be automatically moved and can be orderly carried out with the assistance of manpower, and the digging range of the digging equipment cannot be correspondingly adjusted according to the damaged region of the road surface; in the prior art, no corresponding protection facility is arranged, stone splashing can be caused in the digging process of digging equipment, workers are prone to being injured, and too much labor amount is brought to the workers due to the fact that dug road surface waste cannot be better collected and treated.
本发明涉及一种机器人开凿地面结构,包括安装支座与开凿单元,所述安装支座下表面设置固定设置有开凿单元。本发明可以解决目前存在的问题:现有的开凿设备为单体工作结构,在工人手持开凿设备进行工作时,会给工人带来较大劳动强度的同时,还会使得破损路面的开凿处理效率下降;无法自动的进行位置移动,还需要人力的辅助才能有序进行,而且无法根据路面的破损面积对开凿设备所开凿的范围进行相应的调整;没有设置相应的防护设施,而开凿设备开凿过程会造成石子的飞溅,不仅容易造成工人受伤,还会造成开凿下来的路面废料无法更好的进行收集处理,给工人带来过多的劳动量。
Robot ground digging structure
一种机器人开凿地面结构
LI HUAZHONG (Autor:in) / ZHOU YANBING (Autor:in) / WANG XUANSHENG (Autor:in)
03.09.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Digging through difficult ground
Online Contents | 1993
Ground resistance in digging and dredging
Engineering Index Backfile | 1929
|Digging Frozen Ground with a Ripper Bucket
NTIS | 1992
|