Prefabricated steel-concrete combined bent cap and construction method thereof
The invention discloses a prefabricated steel-concrete combined bent cap and a construction method thereof, and relates to the technical field of bridge engineering, the prefabricated steel-concrete combined bent cap comprises a bent cap and a stand column, a mounting cavity is formed in the middle of the cover beam, the stand column is fixed to the lower end of the mounting cavity, and a plurality of embedded connecting pieces are fixed to the stand column; each embedded connecting piece protrudes out of the upper end face of the stand column and can extend into the mounting cavity, after each embedded connecting piece extends into the mounting cavity and the mounting cavity is filled with the core filling concrete, the core filling concrete can fix the embedded connecting pieces in the mounting cavity, and connection of the bent cap and the stand column is achieved. According to the prefabricated steel-concrete combined cover beam and the construction method thereof, the construction difficulty is reduced, and the field assembling efficiency of a bridge is improved.
本发明公开了一种预制钢混组合盖梁及其施工方法,涉及桥梁工程技术领域,包括盖梁和立柱,盖梁中部开设有安装腔室,立柱固定于安装腔室的下端,立柱上固定有多个预埋连接件,且各预埋连接件均凸出于立柱的上端面并能够伸入至安装腔室内,各预埋连接件伸入至安装腔室内并向安装腔室内填充填芯混凝土后,填芯混凝土能够将预埋连接件固定在安装腔室内,并实现盖梁和立柱的连接。该预制钢混组合盖梁及其施工方法降低了施工难度,提高桥梁现场拼装效率。
Prefabricated steel-concrete combined bent cap and construction method thereof
The invention discloses a prefabricated steel-concrete combined bent cap and a construction method thereof, and relates to the technical field of bridge engineering, the prefabricated steel-concrete combined bent cap comprises a bent cap and a stand column, a mounting cavity is formed in the middle of the cover beam, the stand column is fixed to the lower end of the mounting cavity, and a plurality of embedded connecting pieces are fixed to the stand column; each embedded connecting piece protrudes out of the upper end face of the stand column and can extend into the mounting cavity, after each embedded connecting piece extends into the mounting cavity and the mounting cavity is filled with the core filling concrete, the core filling concrete can fix the embedded connecting pieces in the mounting cavity, and connection of the bent cap and the stand column is achieved. According to the prefabricated steel-concrete combined cover beam and the construction method thereof, the construction difficulty is reduced, and the field assembling efficiency of a bridge is improved.
本发明公开了一种预制钢混组合盖梁及其施工方法,涉及桥梁工程技术领域,包括盖梁和立柱,盖梁中部开设有安装腔室,立柱固定于安装腔室的下端,立柱上固定有多个预埋连接件,且各预埋连接件均凸出于立柱的上端面并能够伸入至安装腔室内,各预埋连接件伸入至安装腔室内并向安装腔室内填充填芯混凝土后,填芯混凝土能够将预埋连接件固定在安装腔室内,并实现盖梁和立柱的连接。该预制钢混组合盖梁及其施工方法降低了施工难度,提高桥梁现场拼装效率。
Prefabricated steel-concrete combined bent cap and construction method thereof
预制钢混组合盖梁及其施工方法
LI YONGJUN (Autor:in) / LIU SIWEI (Autor:in) / LI ZELIN (Autor:in) / LIU YUQING (Autor:in)
07.09.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2021
|Lightweight prefabricated steel-concrete combined type bent cap structure
Europäisches Patentamt | 2024
|Prefabricated high-strength steel-UHPC combined bent cap and construction method thereof
Europäisches Patentamt | 2024
|Assembly type prefabricated steel-concrete composite bent cap and construction method thereof
Europäisches Patentamt | 2020
|Integrally-prefabricated assembled combined bent cap and construction method thereof
Europäisches Patentamt | 2020
|