Precast pile construction method
The invention relates to the field of pile body construction, in particular to a precast pile construction method. The precast pile construction method comprises the following steps of preparation before construction, clearing of a pile body construction site, determination of the position and depth of a pile hole, opening of the pile hole, clearing of mudstone in the pile hole, pile sinking, pile splicing and precast pile head treatment. Before a precast pile sinks into the ground of the pile body construction site, the precast pile is clamped through a pile body clamping frame, and the precast pile can sink into a drill hole in a mode of being perpendicular to the ground of a surveying site, so that the precast pile sinks into the ground more deeply, the fixing effect of the precast pile is improved, and then the reasonability of the pile body construction method is further improved.
本申请涉及桩体施工的领域,尤其是涉及一种预制桩施工方法,其包括以下步骤:施工前的准备、桩体施工现场的清理、桩孔位置及深度的确定、桩孔的开设、桩孔内泥石的清理、沉桩、接桩及预制桩桩头处理。本申请在预制桩沉入桩体施工现场的地面前,通过桩体卡接架卡接预制桩,预制桩能够垂直于勘测现场地面沉入钻孔内,使预制桩沉入地面深度更深,提升了预制桩的固定效果,进而提升了桩体施工方法的合理性。
Precast pile construction method
The invention relates to the field of pile body construction, in particular to a precast pile construction method. The precast pile construction method comprises the following steps of preparation before construction, clearing of a pile body construction site, determination of the position and depth of a pile hole, opening of the pile hole, clearing of mudstone in the pile hole, pile sinking, pile splicing and precast pile head treatment. Before a precast pile sinks into the ground of the pile body construction site, the precast pile is clamped through a pile body clamping frame, and the precast pile can sink into a drill hole in a mode of being perpendicular to the ground of a surveying site, so that the precast pile sinks into the ground more deeply, the fixing effect of the precast pile is improved, and then the reasonability of the pile body construction method is further improved.
本申请涉及桩体施工的领域,尤其是涉及一种预制桩施工方法,其包括以下步骤:施工前的准备、桩体施工现场的清理、桩孔位置及深度的确定、桩孔的开设、桩孔内泥石的清理、沉桩、接桩及预制桩桩头处理。本申请在预制桩沉入桩体施工现场的地面前,通过桩体卡接架卡接预制桩,预制桩能够垂直于勘测现场地面沉入钻孔内,使预制桩沉入地面深度更深,提升了预制桩的固定效果,进而提升了桩体施工方法的合理性。
Precast pile construction method
一种预制桩施工方法
XIE GANGYI (Autor:in) / LUO AIMIN (Autor:in) / LIU YINGJIE (Autor:in)
07.09.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Precast pile construction method and precast pile construction equipment
Europäisches Patentamt | 2021
|Precast pile with pile cap and construction method of precast pile
Europäisches Patentamt | 2023
|Construction method of precast pile foundation and precast pile foundation
Europäisches Patentamt | 2024
|Expanding precast pile and construction method for expanding precast pile
Europäisches Patentamt | 2022
|