Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile stabilizing frame for pile sinking of offshore wind power batter pile group and pile sinking method
The invention relates to a pile stabilizing frame for pile sinking of an offshore wind power batter pile group and a pile sinking method. The pile stabilizing frame comprises a supporting frame, a first limiting frame and a second limiting frame; the first limiting frame and the second limiting frame are arranged at two opposite ends of the supporting frame correspondingly; rotatable first batter pile positioning mechanisms are arranged on the first limiting frame; a plurality of second batter pile positioning mechanisms are arranged on the second limiting frame; and on a horizontal plane, the projection area of the first limiting frame is smaller than or equal to the projection area of the second limiting frame. According to the pile stabilizing frame, fixing and inclination adjusting of a plurality of batter piles can be achieved, the batter piles do not need to be hoisted by moving ship position for multiple times, on the one hand, the safety risk is reduced, on the other hand, the working procedures can be reduced, the pile sinking efficiency is improved, and then the installation cost is saved. The rotatable second batter pile positioning mechanisms are arranged to be matched with the plurality of first batter pile positioning mechanisms, so that the overall weight of equipment can be reduced, the production and installation difficulty is reduced, and the cost is saved.
本发明涉及一种用于海上风电斜桩群沉桩的稳桩架及沉桩方法,稳桩架包括:支撑架和分别设置在支撑架相对的两端的第一限位架和第二限位架,第一限位架上设有可转动的第一斜桩定位机构,第二限位架上设有多个第二斜桩定位机构,其中,在水平面上,第一限位架的投影面积小于等于第二限位架的投影面积。根据本发明的稳桩架,能够实现对多个斜桩的固定以及倾斜度调整,无需多次移动船位对斜桩进行吊桩,一方面降低了安全风险,另一方面能够节约工序,提升沉桩效率,进而节约安装成本。而通过设置可转动的第二斜桩定位机构,与多个第一斜桩定位机构配合,能够减轻设备整体重量,降低生产安装难度,节约成本。
Pile stabilizing frame for pile sinking of offshore wind power batter pile group and pile sinking method
The invention relates to a pile stabilizing frame for pile sinking of an offshore wind power batter pile group and a pile sinking method. The pile stabilizing frame comprises a supporting frame, a first limiting frame and a second limiting frame; the first limiting frame and the second limiting frame are arranged at two opposite ends of the supporting frame correspondingly; rotatable first batter pile positioning mechanisms are arranged on the first limiting frame; a plurality of second batter pile positioning mechanisms are arranged on the second limiting frame; and on a horizontal plane, the projection area of the first limiting frame is smaller than or equal to the projection area of the second limiting frame. According to the pile stabilizing frame, fixing and inclination adjusting of a plurality of batter piles can be achieved, the batter piles do not need to be hoisted by moving ship position for multiple times, on the one hand, the safety risk is reduced, on the other hand, the working procedures can be reduced, the pile sinking efficiency is improved, and then the installation cost is saved. The rotatable second batter pile positioning mechanisms are arranged to be matched with the plurality of first batter pile positioning mechanisms, so that the overall weight of equipment can be reduced, the production and installation difficulty is reduced, and the cost is saved.
本发明涉及一种用于海上风电斜桩群沉桩的稳桩架及沉桩方法,稳桩架包括:支撑架和分别设置在支撑架相对的两端的第一限位架和第二限位架,第一限位架上设有可转动的第一斜桩定位机构,第二限位架上设有多个第二斜桩定位机构,其中,在水平面上,第一限位架的投影面积小于等于第二限位架的投影面积。根据本发明的稳桩架,能够实现对多个斜桩的固定以及倾斜度调整,无需多次移动船位对斜桩进行吊桩,一方面降低了安全风险,另一方面能够节约工序,提升沉桩效率,进而节约安装成本。而通过设置可转动的第二斜桩定位机构,与多个第一斜桩定位机构配合,能够减轻设备整体重量,降低生产安装难度,节约成本。
Pile stabilizing frame for pile sinking of offshore wind power batter pile group and pile sinking method
一种用于海上风电斜桩群沉桩的稳桩架及沉桩方法
LIU TIANTAO (Autor:in) / XU WEIQUN (Autor:in) / HUANG JINHAI (Autor:in) / LIANG JIAKANG (Autor:in) / LI RUIJIE (Autor:in) / ZHOU HONGLIANG (Autor:in) / LYU LEILEI (Autor:in) / YANG JIANCHONG (Autor:in) / ZHENG YUANBIN (Autor:in) / PENG SHANGZHI (Autor:in)
07.09.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Offshore platform cable protection pile, pile sinking method and pile sinking device
Europäisches Patentamt | 2022
|Pile sinking method for offshore wind power pile foundation
Europäisches Patentamt | 2023
|Wind power single pile, pile sinking construction device and pile sinking construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|