Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction process of building ecological roof system
The invention relates to the technical field of building roofs, in particular to a construction process of a building ecological roof system. The construction process comprises the following steps of 1, 2, 3, 4 and 5. A keel is arranged at the top of a building body, the keel is in threaded connection with a supporting column, a connecting beam and a supporting column connecting beam are connected at the top of the supporting column through cooperation of a threaded column and a threaded cylinder, the connecting beam and a protective wall are fixed through a connecting plate, and therefore the connecting beam can be rapidly and stably installed; and rainwater can be conveniently collected and discharged by arranging a water collecting groove, a sliding groove in the water collecting groove and a sliding groove in the connecting beam are connected with a connecting shaft through a rolling wheel and a connecting rod, so that when a sun shield is moved, the sun shield can be driven to move and fold when a hinge shaft moves, people can conveniently adjust the sun shield to expose and shield the top of the building body according to different seasons, and the energy consumption of the roof can be reduced through the sun shield.
本发明涉及建筑物屋面技术领域,具体为一种建筑生态屋面系统的施工工艺,包括以下步骤:步骤一、步骤二、步骤三、步骤四、步骤五。本发明通过在建筑本体的顶部设置龙骨,龙骨上螺纹连接支撑柱,并在支撑柱顶部通过螺纹柱和螺纹筒的配合将连接梁与支撑柱连接梁进行连接,并通过连接板将连接梁与护墙进行固定,使连接梁能够快捷稳定的进行安装,通过设置集水槽便于将雨水收集排出,集水槽上的滑槽和连接梁上的滑槽通过滚轮和连接杆与连接轴进行连接,使得移动遮阳板,在铰接轴移动时可以带动遮阳板进行移动和折叠,从而便于人们根据不同的季节来调节遮阳板对建筑本体的顶部进行裸露和遮挡,从而通过遮阳板能够降低屋面的耗能。
Construction process of building ecological roof system
The invention relates to the technical field of building roofs, in particular to a construction process of a building ecological roof system. The construction process comprises the following steps of 1, 2, 3, 4 and 5. A keel is arranged at the top of a building body, the keel is in threaded connection with a supporting column, a connecting beam and a supporting column connecting beam are connected at the top of the supporting column through cooperation of a threaded column and a threaded cylinder, the connecting beam and a protective wall are fixed through a connecting plate, and therefore the connecting beam can be rapidly and stably installed; and rainwater can be conveniently collected and discharged by arranging a water collecting groove, a sliding groove in the water collecting groove and a sliding groove in the connecting beam are connected with a connecting shaft through a rolling wheel and a connecting rod, so that when a sun shield is moved, the sun shield can be driven to move and fold when a hinge shaft moves, people can conveniently adjust the sun shield to expose and shield the top of the building body according to different seasons, and the energy consumption of the roof can be reduced through the sun shield.
本发明涉及建筑物屋面技术领域,具体为一种建筑生态屋面系统的施工工艺,包括以下步骤:步骤一、步骤二、步骤三、步骤四、步骤五。本发明通过在建筑本体的顶部设置龙骨,龙骨上螺纹连接支撑柱,并在支撑柱顶部通过螺纹柱和螺纹筒的配合将连接梁与支撑柱连接梁进行连接,并通过连接板将连接梁与护墙进行固定,使连接梁能够快捷稳定的进行安装,通过设置集水槽便于将雨水收集排出,集水槽上的滑槽和连接梁上的滑槽通过滚轮和连接杆与连接轴进行连接,使得移动遮阳板,在铰接轴移动时可以带动遮阳板进行移动和折叠,从而便于人们根据不同的季节来调节遮阳板对建筑本体的顶部进行裸露和遮挡,从而通过遮阳板能够降低屋面的耗能。
Construction process of building ecological roof system
一种建筑生态屋面系统的施工工艺
WANG HAO (Autor:in) / TAN XIAO (Autor:in) / SUN YINGHUI (Autor:in)
07.09.2021
Patent
Elektronische Ressource
Chinesisch
Construction technology of building ecological roof system
Europäisches Patentamt | 2022
|Public building special-shaped roof ecological greening system and construction method thereof
Europäisches Patentamt | 2024
|Bamboo structure building roof system and construction process thereof
Europäisches Patentamt | 2015
|