Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention provides a hollow prefabricated assembled pier adopting a grouting sleeve, and the pier comprises a pier body with a through pouring hole, wherein the grouting sleeve is embedded in the lower surface of the pier body, the grouting sleeve is circularly arranged around the pouring hole, a U-shaped steel bar is inversely arranged in a bearing platform main body, and the U-shaped end of the U-shaped steel bar extends out of the upper surface of the bearing platform for a certain length, and the length can be adjusted according to needs; the embedded part is provided with a plurality of pier main ribs evenly distributed in the bearing platform body, and the top of each pier main rib is provided with a connecting part extending out of the upper surface of the bearing platform body. The invention further discloses a connecting method of the hollow prefabricated assembled bridge pier adopting the grouting sleeve. According to the prefabricated pier with the pouring holes, the stress performance is fully guaranteed, the anti-seismic performance of the pier body is improved, and the innate problems that a hollow pier is poor in bending resistance and shearing resistance are solved.
本发明提供了一种采用灌浆套筒的空心预制拼装桥墩,包括:具有贯穿浇灌孔的墩身,灌浆套筒内嵌于墩身的下表面,灌浆套筒圆形布设于浇灌孔四周,U型钢筋倒置于承台主体内,且U型钢筋的U型端位置从承台的上表面伸出一定的长度,其长度可以根据需求进行调节,预埋件具有若干均布于承台主体内的桥墩主筋,桥墩主筋的顶部具有伸出承台主体上表面的连接部。本发明还公开了一种采用灌浆套筒的空心预制拼装桥墩的连接方法。本发明的具有浇灌孔的预制桥墩不但充分保证了受力性能,提高了墩身的抗震性能,克服了空心桥墩抗弯能力弱,抗剪能力差的先天问题。
The invention provides a hollow prefabricated assembled pier adopting a grouting sleeve, and the pier comprises a pier body with a through pouring hole, wherein the grouting sleeve is embedded in the lower surface of the pier body, the grouting sleeve is circularly arranged around the pouring hole, a U-shaped steel bar is inversely arranged in a bearing platform main body, and the U-shaped end of the U-shaped steel bar extends out of the upper surface of the bearing platform for a certain length, and the length can be adjusted according to needs; the embedded part is provided with a plurality of pier main ribs evenly distributed in the bearing platform body, and the top of each pier main rib is provided with a connecting part extending out of the upper surface of the bearing platform body. The invention further discloses a connecting method of the hollow prefabricated assembled bridge pier adopting the grouting sleeve. According to the prefabricated pier with the pouring holes, the stress performance is fully guaranteed, the anti-seismic performance of the pier body is improved, and the innate problems that a hollow pier is poor in bending resistance and shearing resistance are solved.
本发明提供了一种采用灌浆套筒的空心预制拼装桥墩,包括:具有贯穿浇灌孔的墩身,灌浆套筒内嵌于墩身的下表面,灌浆套筒圆形布设于浇灌孔四周,U型钢筋倒置于承台主体内,且U型钢筋的U型端位置从承台的上表面伸出一定的长度,其长度可以根据需求进行调节,预埋件具有若干均布于承台主体内的桥墩主筋,桥墩主筋的顶部具有伸出承台主体上表面的连接部。本发明还公开了一种采用灌浆套筒的空心预制拼装桥墩的连接方法。本发明的具有浇灌孔的预制桥墩不但充分保证了受力性能,提高了墩身的抗震性能,克服了空心桥墩抗弯能力弱,抗剪能力差的先天问题。
Hollow prefabricated assembled bridge pier adopting grouting sleeves and connecting method of hollow prefabricated assembled bridge pier
一种采用灌浆套筒的空心预制拼装桥墩及其连接方法
10.09.2021
Patent
Elektronische Ressource
Chinesisch
Connecting hinge suitable for prefabricated assembled bridge pier
Europäisches Patentamt | 2021
|Prefabricated hollow pier connected through grouting sleeves and construction method thereof
Europäisches Patentamt | 2022
|Prefabricated bridge pier connection construction method adopting first grouting
Europäisches Patentamt | 2023
|Connecting structure of prefabricated assembled bridge pier and construction method
Europäisches Patentamt | 2021
|Prefabricated assembled pier and forming method of prefabricated assembled pier
Europäisches Patentamt | 2020
|