Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Basement waterproof construction method
The invention discloses a basement waterproof construction method, and belongs to the technical field of building underground structure waterproof construction. The basement waterproof construction method comprises the following steps: S1, preparing a water pipe with two open ends, and recording the water pipe as a water guide pipe; drilling holes in the outer wall of the water guide pipe to form a plurality of water inlet holes along the axis of the water guide pipe; preparing an inner pipe which can be inserted into the water guide pipe; preparing a template, and cutting the template to enable the water guide pipe to penetrate through the template; S2, supporting a formwork in a foundation pit to form a pouring cavity, taking the water guide pipe to penetrate through the formwork, and enabling the two ends of the water guide pipe to be both located outside the pouring cavity; inserting the inner pipe into the water guide pipe; and S3, pouring concrete into the pouring cavity, after the concrete is solidified, pulling the inner pipe away and removing the formwork to form the outer wall. The method has the effect of realizing active waterproofing of the basement.
本申请涉及一种地下室防水施工方法,属于建筑地下结构防水施工的技术领域,其包括如下步骤:S1,准备两端开口的水管,记为导水管;在导水管外壁上钻孔,形成多个沿导水管轴线的入水孔;准备内管,内管能够插入到导水管内部;准备模板,切割模板使得导水管能够穿过模板;S2,在基坑内部支护模板,形成浇筑空腔,取导水管穿过模板,使得导水管两端均位于浇筑空腔外部;将内管插入到导水管内部;S3,在浇筑空腔内浇筑混凝土,待混凝土凝固后,抽离内管、拆除模板形成外墙。本申请具有实现地下室主动防水的效果。
Basement waterproof construction method
The invention discloses a basement waterproof construction method, and belongs to the technical field of building underground structure waterproof construction. The basement waterproof construction method comprises the following steps: S1, preparing a water pipe with two open ends, and recording the water pipe as a water guide pipe; drilling holes in the outer wall of the water guide pipe to form a plurality of water inlet holes along the axis of the water guide pipe; preparing an inner pipe which can be inserted into the water guide pipe; preparing a template, and cutting the template to enable the water guide pipe to penetrate through the template; S2, supporting a formwork in a foundation pit to form a pouring cavity, taking the water guide pipe to penetrate through the formwork, and enabling the two ends of the water guide pipe to be both located outside the pouring cavity; inserting the inner pipe into the water guide pipe; and S3, pouring concrete into the pouring cavity, after the concrete is solidified, pulling the inner pipe away and removing the formwork to form the outer wall. The method has the effect of realizing active waterproofing of the basement.
本申请涉及一种地下室防水施工方法,属于建筑地下结构防水施工的技术领域,其包括如下步骤:S1,准备两端开口的水管,记为导水管;在导水管外壁上钻孔,形成多个沿导水管轴线的入水孔;准备内管,内管能够插入到导水管内部;准备模板,切割模板使得导水管能够穿过模板;S2,在基坑内部支护模板,形成浇筑空腔,取导水管穿过模板,使得导水管两端均位于浇筑空腔外部;将内管插入到导水管内部;S3,在浇筑空腔内浇筑混凝土,待混凝土凝固后,抽离内管、拆除模板形成外墙。本申请具有实现地下室主动防水的效果。
Basement waterproof construction method
地下室防水施工方法
SHEN GUOLIN (Autor:in) / DU JIAQING (Autor:in) / CHENG XIAOFENG (Autor:in)
10.09.2021
Patent
Elektronische Ressource
Chinesisch