Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Metal building fence
The invention relates to the technical field of building fences, and particularly relates to a metal building fence. A protective structure is located on one side of the upper end of a fence plate, wherein the protective structure is fixedly connected with the fence plate, and a working platform is located on one side of the upper end of the fence plate, and the working platform is located on the lower side of the outer end of the protective structure. By arranging the protective structure, not only can a water pipe be protected, but also the upper end of the fence can be protected, the phenomenon that the fence is damaged is effectively prevented, and then the service life of the fence is effectively prolonged; by arranging the working platform and the structure on the working platform, not only can the protective structure be quickly fixed, convenience is brought to work of workers, but also the angle of a water spraying head can be adjusted, and the purpose of more effectively removing dust according to actual use is achieved.
本发明涉及建筑围挡技术领域,具体为一种金属建筑围挡。所述防护结构位于围挡板上端一侧,其中防护结构与围挡板之间进行固定连接,所述做功平台位于围挡板上端一侧,其中做功平台位于防护结构外端偏下侧。通过对防护结构的设置,不仅可以对水管进行保护,还可以对围挡上端进行保护,有效的防止围挡发生损坏的现象,进而有效的延长了围挡的使用寿命;通过对做功平台以及做功平台上结构的设置,不仅可以对防护结构进行快速固定,给工作人员的工作带来便利,同时还可以对喷水头的角度进行调节,有利于根据实际使用,达到更有效除尘的目的。
Metal building fence
The invention relates to the technical field of building fences, and particularly relates to a metal building fence. A protective structure is located on one side of the upper end of a fence plate, wherein the protective structure is fixedly connected with the fence plate, and a working platform is located on one side of the upper end of the fence plate, and the working platform is located on the lower side of the outer end of the protective structure. By arranging the protective structure, not only can a water pipe be protected, but also the upper end of the fence can be protected, the phenomenon that the fence is damaged is effectively prevented, and then the service life of the fence is effectively prolonged; by arranging the working platform and the structure on the working platform, not only can the protective structure be quickly fixed, convenience is brought to work of workers, but also the angle of a water spraying head can be adjusted, and the purpose of more effectively removing dust according to actual use is achieved.
本发明涉及建筑围挡技术领域,具体为一种金属建筑围挡。所述防护结构位于围挡板上端一侧,其中防护结构与围挡板之间进行固定连接,所述做功平台位于围挡板上端一侧,其中做功平台位于防护结构外端偏下侧。通过对防护结构的设置,不仅可以对水管进行保护,还可以对围挡上端进行保护,有效的防止围挡发生损坏的现象,进而有效的延长了围挡的使用寿命;通过对做功平台以及做功平台上结构的设置,不仅可以对防护结构进行快速固定,给工作人员的工作带来便利,同时还可以对喷水头的角度进行调节,有利于根据实际使用,达到更有效除尘的目的。
Metal building fence
一种金属建筑围挡
XIE SHUXIANG (Autor:in) / DU FAPING (Autor:in)
10.09.2021
Patent
Elektronische Ressource
Chinesisch