Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pouring and tamping method for constructing vertical structure concrete of underground structure through reverse building method
The invention discloses a pouring and tamping method for constructing vertical structure concrete of an underground structure through a reverse construction method. The pouring and tamping method is characterized in that a mode of pre-burying pouring and tamping pipes and vibrating pipes when steel bars at joints of floors, beams, columns and walls are bound is used for replacing a mode of pouring concrete by reserving herringbone angles on column and wall formworks in a reverse construction method construction process. The pouring and tamping pipes and the vibrating pipes are fixed by welding to the steel bars or welding to arranged positioning steel bars, and are reserved in the floor before concrete of the floor is poured; the tops of the pouring and tamping pipes and the vibrating pipes extend out of the top face elevation of the floor, and the bottom ends of the pouring and tamping pipes and the vibrating pipes directly abut against the formworks; after concrete pouring of the floor is completed and before pouring of a lower-layer vertical structure concrete is carried out, the tops of the pouring and tamping pipes and the vibrating pipes are plugged through plugging materials such as rubber strips, so that pollution is avoided, plugging is removed when the lower-layer vertical structure concrete is poured, and concrete pouring and vibrating construction is carried out; and most of the pouring and tamping pipes and the vibrating pipes do not need to be cut off and are directly poured in the structure, and the pouring and tamping pipes and the vibrating pipes which are not provided with the structure on the upper portion are cut off and tightly stuffed.
本发明公开了一种逆作法施工地下构筑物竖向结构混凝土浇捣方法,通过在楼板、梁及柱、墙节点钢筋绑扎时预埋浇捣管和振捣管的方式,取代逆作法施工中,柱、墙模板留八字角进行浇筑混凝土的方式。浇捣管和振捣管通过与钢筋焊接或设置定位钢筋进行焊接进行固定,在本层楼板混凝土浇筑前预留在楼板内;浇捣管和振捣管顶部伸出本层楼板顶面标高,底端直接顶紧模板;在本层楼板混凝土浇筑完成后,下层竖向结构混凝土浇筑前,将浇捣管和振捣管顶部用胶条等封堵材料进行封堵,避免污染,浇筑下层竖向结构混凝土时拆除封堵,进行混凝土浇筑和振捣施工;大部分浇捣管和振捣管无需割除,直接浇筑在结构中,对上方无结构的浇捣管和振捣管进行割除并填塞严密。
Pouring and tamping method for constructing vertical structure concrete of underground structure through reverse building method
The invention discloses a pouring and tamping method for constructing vertical structure concrete of an underground structure through a reverse construction method. The pouring and tamping method is characterized in that a mode of pre-burying pouring and tamping pipes and vibrating pipes when steel bars at joints of floors, beams, columns and walls are bound is used for replacing a mode of pouring concrete by reserving herringbone angles on column and wall formworks in a reverse construction method construction process. The pouring and tamping pipes and the vibrating pipes are fixed by welding to the steel bars or welding to arranged positioning steel bars, and are reserved in the floor before concrete of the floor is poured; the tops of the pouring and tamping pipes and the vibrating pipes extend out of the top face elevation of the floor, and the bottom ends of the pouring and tamping pipes and the vibrating pipes directly abut against the formworks; after concrete pouring of the floor is completed and before pouring of a lower-layer vertical structure concrete is carried out, the tops of the pouring and tamping pipes and the vibrating pipes are plugged through plugging materials such as rubber strips, so that pollution is avoided, plugging is removed when the lower-layer vertical structure concrete is poured, and concrete pouring and vibrating construction is carried out; and most of the pouring and tamping pipes and the vibrating pipes do not need to be cut off and are directly poured in the structure, and the pouring and tamping pipes and the vibrating pipes which are not provided with the structure on the upper portion are cut off and tightly stuffed.
本发明公开了一种逆作法施工地下构筑物竖向结构混凝土浇捣方法,通过在楼板、梁及柱、墙节点钢筋绑扎时预埋浇捣管和振捣管的方式,取代逆作法施工中,柱、墙模板留八字角进行浇筑混凝土的方式。浇捣管和振捣管通过与钢筋焊接或设置定位钢筋进行焊接进行固定,在本层楼板混凝土浇筑前预留在楼板内;浇捣管和振捣管顶部伸出本层楼板顶面标高,底端直接顶紧模板;在本层楼板混凝土浇筑完成后,下层竖向结构混凝土浇筑前,将浇捣管和振捣管顶部用胶条等封堵材料进行封堵,避免污染,浇筑下层竖向结构混凝土时拆除封堵,进行混凝土浇筑和振捣施工;大部分浇捣管和振捣管无需割除,直接浇筑在结构中,对上方无结构的浇捣管和振捣管进行割除并填塞严密。
Pouring and tamping method for constructing vertical structure concrete of underground structure through reverse building method
一种逆作法施工地下构筑物竖向结构混凝土浇捣方法
YIN HONGJIANG (Autor:in) / LIU JIAN (Autor:in) / DIAO XIAOXIANG (Autor:in) / TANG HAIQIANG (Autor:in) / YANG XIAOPENG (Autor:in)
17.09.2021
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|