Fabricated outer wall hoisting and mounting construction method
The invention relates to a fabricated outer wall hoisting and mounting construction method. The fabricated outer wall hoisting and mounting construction method comprises the steps of popping up an elevation line on an unhoisted outer wall board component on a floor column body, and releasing an inner and outer control line and a left and right control line of an outer wall board on a floor board face; welding a temporary lifting point to a connecting piece steel plate pre-buried in a main body structure edge beam, mounting the temporary lifting point on a second layer on the upper face of an outer wall board mounting floor, and mounting a chain block on the temporary lifting point before hoisting; hoisting an outer wall board to a mounting position by a tower crane, transferring the outer wall board to a lifting hook, and pulling the chain block to enable the outer wall board to be initially in place; achieving accurate positioning; welding and fixing; erecting an inner side formwork; and pouring a concrete wall body between the outer wall board and the inner side formwork. According to the fabricated outer wall hoisting and mounting construction method, after all the outer wall boards of one operation batch are transferred to the chain block and temporarily fixed, the outer wall boards are positioned, adjusted, welded and fixed one by one, the problem that a traditional hoisting mode depends on the tower crane for hoisting, adjusting, welding and other procedures of a single outer wall board is solved, batch line production is achieved, and the construction efficiency is improved.
本发明涉及一种装配式外墙吊装及安装施工方法,在楼层柱体上未起吊的外墙板构件上弹出标高线,在该楼层板面上放出外墙板里外控制线和左右控制线;在主体结构边梁内预埋的连接件钢板上焊接临时吊点,临时吊点安装外墙板安装楼层的上面第二层,吊装前将手拉葫芦安装在临时吊点上;塔吊起吊外墙板拉到安装位置,将外墙板转移到吊钩,拉动手拉葫芦,使外墙板初步就位;精准定位;焊接固定;支设内侧模板;在外墙板与内侧模板之间浇筑混凝土墙体。本发明一个作业批次的外墙板全部转移至手拉葫芦并临时固定后,逐一定位调节、焊接固定,解决了传统吊装方式依赖于塔吊进行单块外墙板的吊装、调节、焊接等工序,达到分批次流水作业,提高了施工效率。
Fabricated outer wall hoisting and mounting construction method
The invention relates to a fabricated outer wall hoisting and mounting construction method. The fabricated outer wall hoisting and mounting construction method comprises the steps of popping up an elevation line on an unhoisted outer wall board component on a floor column body, and releasing an inner and outer control line and a left and right control line of an outer wall board on a floor board face; welding a temporary lifting point to a connecting piece steel plate pre-buried in a main body structure edge beam, mounting the temporary lifting point on a second layer on the upper face of an outer wall board mounting floor, and mounting a chain block on the temporary lifting point before hoisting; hoisting an outer wall board to a mounting position by a tower crane, transferring the outer wall board to a lifting hook, and pulling the chain block to enable the outer wall board to be initially in place; achieving accurate positioning; welding and fixing; erecting an inner side formwork; and pouring a concrete wall body between the outer wall board and the inner side formwork. According to the fabricated outer wall hoisting and mounting construction method, after all the outer wall boards of one operation batch are transferred to the chain block and temporarily fixed, the outer wall boards are positioned, adjusted, welded and fixed one by one, the problem that a traditional hoisting mode depends on the tower crane for hoisting, adjusting, welding and other procedures of a single outer wall board is solved, batch line production is achieved, and the construction efficiency is improved.
本发明涉及一种装配式外墙吊装及安装施工方法,在楼层柱体上未起吊的外墙板构件上弹出标高线,在该楼层板面上放出外墙板里外控制线和左右控制线;在主体结构边梁内预埋的连接件钢板上焊接临时吊点,临时吊点安装外墙板安装楼层的上面第二层,吊装前将手拉葫芦安装在临时吊点上;塔吊起吊外墙板拉到安装位置,将外墙板转移到吊钩,拉动手拉葫芦,使外墙板初步就位;精准定位;焊接固定;支设内侧模板;在外墙板与内侧模板之间浇筑混凝土墙体。本发明一个作业批次的外墙板全部转移至手拉葫芦并临时固定后,逐一定位调节、焊接固定,解决了传统吊装方式依赖于塔吊进行单块外墙板的吊装、调节、焊接等工序,达到分批次流水作业,提高了施工效率。
Fabricated outer wall hoisting and mounting construction method
一种装配式外墙吊装及安装施工方法
JIN YICHAO (Autor:in) / XUE YUWEN (Autor:in) / WANG YUNPENG (Autor:in)
21.09.2021
Patent
Elektronische Ressource
Chinesisch