Modular installation method for belt conveyor vestibule
The invention discloses a modular installation method for a belt conveyor vestibule. According to the modular installation method, a vestibule is formed by splicing a plurality of vestibule single bodies, the installation method comprises the following steps that S1, vestibule single bodies are divided into large vestibule single bodies and small vestibule single bodies according to the appearance size, the large vestibule single bodies are manufactured in an on-site modular splicing mode, and the small vestibule single bodies are manufactured in an overall transportation and assembly mode. S2, a hoisting scheme and a hoisting sequence are formulated, and the large vestibule single bodies and the small vestibule single bodies are connected according to the assembling sequence to form an integral module; and S3, belt conveyor equipment and a cable bridge are installed on the overall module, and overall hoisting is conducted through a crane. The method reduces the assembly time of an installation site, improves the hoisting efficiency, is beneficial to construction period control, and creates favorable construction period conditions for later equipment and electrical installation; the problem that a large vestibule cannot be integrally transported due to over-limit is solved; and meanwhile, subsequent use of large cranes is reduced, and cost control is facilitated.
本发明公开了一种皮带机通廊模块化安装方法,所述通廊由多个通廊单体拼装而成,所述安装方法包括以下步骤:S1、将通廊单体按照外形大小划分成大型通廊单体和小型通廊单体,所述大型通廊单体采用现场模块化拼装方式进行制作,所述小型通廊单体采用整体运输组装方式进行制作;S2、制定吊装方案和吊装顺序,将大型通廊单体和小型通廊单体按照装配顺序进行衔接形成整体模块;S3、将皮带机设备、电缆桥架安装在整体模块上,利用吊车进行整体吊装。本发明减少安装现场组装时间,提高吊装效率,有利于工期控制,为后期设备、电气安装创造有利工期条件。并且避免大件通廊因超限制无法整体运输的问题。同时减少后续大吊车使用,有利于成本控制。
Modular installation method for belt conveyor vestibule
The invention discloses a modular installation method for a belt conveyor vestibule. According to the modular installation method, a vestibule is formed by splicing a plurality of vestibule single bodies, the installation method comprises the following steps that S1, vestibule single bodies are divided into large vestibule single bodies and small vestibule single bodies according to the appearance size, the large vestibule single bodies are manufactured in an on-site modular splicing mode, and the small vestibule single bodies are manufactured in an overall transportation and assembly mode. S2, a hoisting scheme and a hoisting sequence are formulated, and the large vestibule single bodies and the small vestibule single bodies are connected according to the assembling sequence to form an integral module; and S3, belt conveyor equipment and a cable bridge are installed on the overall module, and overall hoisting is conducted through a crane. The method reduces the assembly time of an installation site, improves the hoisting efficiency, is beneficial to construction period control, and creates favorable construction period conditions for later equipment and electrical installation; the problem that a large vestibule cannot be integrally transported due to over-limit is solved; and meanwhile, subsequent use of large cranes is reduced, and cost control is facilitated.
本发明公开了一种皮带机通廊模块化安装方法,所述通廊由多个通廊单体拼装而成,所述安装方法包括以下步骤:S1、将通廊单体按照外形大小划分成大型通廊单体和小型通廊单体,所述大型通廊单体采用现场模块化拼装方式进行制作,所述小型通廊单体采用整体运输组装方式进行制作;S2、制定吊装方案和吊装顺序,将大型通廊单体和小型通廊单体按照装配顺序进行衔接形成整体模块;S3、将皮带机设备、电缆桥架安装在整体模块上,利用吊车进行整体吊装。本发明减少安装现场组装时间,提高吊装效率,有利于工期控制,为后期设备、电气安装创造有利工期条件。并且避免大件通廊因超限制无法整体运输的问题。同时减少后续大吊车使用,有利于成本控制。
Modular installation method for belt conveyor vestibule
一种皮带机通廊模块化安装方法
LIN FUBIN (Autor:in) / MENG QINGHUAN (Autor:in) / YANG LIFA (Autor:in)
24.09.2021
Patent
Elektronische Ressource
Chinesisch
Belt conveyor vestibule modularization assembling method
Europäisches Patentamt | 2021
|