Forming construction method of stiff composite pile
The invention relates to a construction method of a stiff composite pile. The method comprises the following steps that firstly, stirring and curing are carried out a curing material and in-situ soil on the upper surface of an in-situ soil layer in situ to form a curing layer; secondly, four composite piles are driven into the in-situ soil layer in sequence, and the four composite piles are distributed in a quadrangle shape; thirdly, a positioning column used for positioning the composite pile is installed on each composite pile, and the positioning columns are fixed to a fixing layer; fourthly, the four positioning columns are connected together through a support; fifthly, each composite pile is provided with a clamping mechanism used for clamping the corresponding positioning column; and sixthly, the composite piles and the positioning columns are fixed together through the clamping mechanisms. The installation stability of the stiff composite pile is improved through the method.
本申请涉及一种劲性复合桩的施工工法,其包括如下步骤:步骤一:在原位土层上表面将固化材料与原位土进行就地搅拌固化,使之形成固化层;步骤二:将四根复合桩依次打入原位土层内,使四根复合桩呈四边形分布;步骤三:在每根复合桩上均安装用于对复合桩进行定位的定位柱,将所述定位柱固定于所述固定层上;步骤四:通过支架将四个定位柱连接在一起;步骤五:在每根复合桩上均设置有用于夹紧定位柱的夹紧机构;步骤六:通过夹紧机构将复合桩和定位柱固定在一起。本申请提高了劲性复合桩安装的稳定性。
Forming construction method of stiff composite pile
The invention relates to a construction method of a stiff composite pile. The method comprises the following steps that firstly, stirring and curing are carried out a curing material and in-situ soil on the upper surface of an in-situ soil layer in situ to form a curing layer; secondly, four composite piles are driven into the in-situ soil layer in sequence, and the four composite piles are distributed in a quadrangle shape; thirdly, a positioning column used for positioning the composite pile is installed on each composite pile, and the positioning columns are fixed to a fixing layer; fourthly, the four positioning columns are connected together through a support; fifthly, each composite pile is provided with a clamping mechanism used for clamping the corresponding positioning column; and sixthly, the composite piles and the positioning columns are fixed together through the clamping mechanisms. The installation stability of the stiff composite pile is improved through the method.
本申请涉及一种劲性复合桩的施工工法,其包括如下步骤:步骤一:在原位土层上表面将固化材料与原位土进行就地搅拌固化,使之形成固化层;步骤二:将四根复合桩依次打入原位土层内,使四根复合桩呈四边形分布;步骤三:在每根复合桩上均安装用于对复合桩进行定位的定位柱,将所述定位柱固定于所述固定层上;步骤四:通过支架将四个定位柱连接在一起;步骤五:在每根复合桩上均设置有用于夹紧定位柱的夹紧机构;步骤六:通过夹紧机构将复合桩和定位柱固定在一起。本申请提高了劲性复合桩安装的稳定性。
Forming construction method of stiff composite pile
劲性复合桩的成型施工工法
DENG LIANGMAN (Autor:in)
28.09.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Forming structure of stiff composite pile and construction method thereof
Europäisches Patentamt | 2024
|Stiff composite pile sinking construction control method
Europäisches Patentamt | 2024
|