Construction method of hexagonal block slope protection
The invention provides a construction method of a hexagonal block slope protection. The construction method comprises the following steps of laying hexagonal blocks: laying the hexagonal blocks on the first slope surface of a side slope, and pouring cement mortar into gaps among the hexagonal blocks so as to form a slope protection base body; measuring the slope ratio: measuring the slope ratio of the second slope surface of the slope protection base body; calculating the drilling angle: calculating the drilling angle according to the slope ratio; erecting a coring machine: erecting the coring machine according to the drilling angle, and adjusting the drill bit angle of the coring machine; and drilling: controlling the coring machine to drill drainage holes in at least part of the hexagonal blocks, wherein the drainage holes penetrate through the hexagonal blocks, and in the vertical direction, the first height of the ends, close to the first slope surface, of the drainage holes is larger than or equal to the second height of the ends, close to the second slope surface, of the drainage holes. According to the construction method, the drainage effect of underground water in the side slope can be increased, and the stability of the hexagonal block slope protection and the stability of the side slope are enhanced.
本发明提供一种六棱块护坡的施工方法,包括以下步骤:六棱块铺设步骤:在边坡的第一坡面上铺设六棱块,对六棱块间的间隙浇筑水泥砂浆,以形成护坡基体;测量坡率步骤:测量护坡基体的第二坡面的坡率;计算钻孔角度步骤:根据坡率计算钻孔角度;架设取芯机步骤:根据钻孔角度架设取芯机,并调节取芯机的钻头角度;钻孔步骤:控制取芯机在至少部分六棱块上钻设泄水孔,泄水孔贯穿六棱块,在铅垂方向上,泄水孔靠近第一坡面的一端的第一高度大于或等于泄水孔靠近第二坡面的一端的第二高度。该施工方法能够提高边坡内部的地下水的排水效果,并增强六棱块护坡稳定性及边坡稳定性。
Construction method of hexagonal block slope protection
The invention provides a construction method of a hexagonal block slope protection. The construction method comprises the following steps of laying hexagonal blocks: laying the hexagonal blocks on the first slope surface of a side slope, and pouring cement mortar into gaps among the hexagonal blocks so as to form a slope protection base body; measuring the slope ratio: measuring the slope ratio of the second slope surface of the slope protection base body; calculating the drilling angle: calculating the drilling angle according to the slope ratio; erecting a coring machine: erecting the coring machine according to the drilling angle, and adjusting the drill bit angle of the coring machine; and drilling: controlling the coring machine to drill drainage holes in at least part of the hexagonal blocks, wherein the drainage holes penetrate through the hexagonal blocks, and in the vertical direction, the first height of the ends, close to the first slope surface, of the drainage holes is larger than or equal to the second height of the ends, close to the second slope surface, of the drainage holes. According to the construction method, the drainage effect of underground water in the side slope can be increased, and the stability of the hexagonal block slope protection and the stability of the side slope are enhanced.
本发明提供一种六棱块护坡的施工方法,包括以下步骤:六棱块铺设步骤:在边坡的第一坡面上铺设六棱块,对六棱块间的间隙浇筑水泥砂浆,以形成护坡基体;测量坡率步骤:测量护坡基体的第二坡面的坡率;计算钻孔角度步骤:根据坡率计算钻孔角度;架设取芯机步骤:根据钻孔角度架设取芯机,并调节取芯机的钻头角度;钻孔步骤:控制取芯机在至少部分六棱块上钻设泄水孔,泄水孔贯穿六棱块,在铅垂方向上,泄水孔靠近第一坡面的一端的第一高度大于或等于泄水孔靠近第二坡面的一端的第二高度。该施工方法能够提高边坡内部的地下水的排水效果,并增强六棱块护坡稳定性及边坡稳定性。
Construction method of hexagonal block slope protection
一种六棱块护坡的施工方法
ZHANG CHENGCHENG (Autor:in) / LIU LIFENG (Autor:in) / LIU GUOQIANG (Autor:in) / WANG JUNTAO (Autor:in)
28.09.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Construction method of high slope protection locking block
Europäisches Patentamt | 2022
|Hexagonal slope protection brick and ecological slope protection system based on same
Europäisches Patentamt | 2024
|