Waterproof construction method suitable for pile head connector
The invention discloses a waterproof construction method suitable for a pile head connector. The waterproof construction method suitable for the pile head connector comprises the following steps that S1, the periphery and the pile center of a pile head are coated with waterproof paint; S2, a waterproof coiled material is laid at the pile head connector and is compacted and firmly bonded, and the outer edge is fixed through a large-cap steel nail; S3, an external waterproof coiled material is laid, and welding is conducted on the landing edge of the waterproof coiled material at the pile head connector; S4, sealing glue is applied to the closing-up position of the waterproof coiled material at the pile head connector; S5, a hose clamp is mounted at a closing position, and sealing glue sealing treatment is conducted again after screwing is conducted; and S6, a concrete surface layer is poured. According to the waterproof construction method suitable for the pile head connector, on-site construction is facilitated, operation is easy, and connection at the pile head connector is tighter.
本发明公开一种适用于桩头接头处的防水施工方法,包括以下步骤:S1、在桩头四周及桩心处涂刷防水涂料;S2、将防水卷材铺设在桩头接头处,进行压实、粘牢,外边处用大帽钢钉固定;S3、铺设外部的防水卷材,与桩头接头处的防水卷材搭边处进行焊接;S4、桩头接头处防水卷材的收口处打密封胶;S5、将喉箍安装在收口位置,拧紧后再进行一次密封胶封闭处理;S6、混凝土面层浇筑;本发明提供了一种便于现场施工,操作简单,桩头接头处衔接更为紧密的防水施工方法。
Waterproof construction method suitable for pile head connector
The invention discloses a waterproof construction method suitable for a pile head connector. The waterproof construction method suitable for the pile head connector comprises the following steps that S1, the periphery and the pile center of a pile head are coated with waterproof paint; S2, a waterproof coiled material is laid at the pile head connector and is compacted and firmly bonded, and the outer edge is fixed through a large-cap steel nail; S3, an external waterproof coiled material is laid, and welding is conducted on the landing edge of the waterproof coiled material at the pile head connector; S4, sealing glue is applied to the closing-up position of the waterproof coiled material at the pile head connector; S5, a hose clamp is mounted at a closing position, and sealing glue sealing treatment is conducted again after screwing is conducted; and S6, a concrete surface layer is poured. According to the waterproof construction method suitable for the pile head connector, on-site construction is facilitated, operation is easy, and connection at the pile head connector is tighter.
本发明公开一种适用于桩头接头处的防水施工方法,包括以下步骤:S1、在桩头四周及桩心处涂刷防水涂料;S2、将防水卷材铺设在桩头接头处,进行压实、粘牢,外边处用大帽钢钉固定;S3、铺设外部的防水卷材,与桩头接头处的防水卷材搭边处进行焊接;S4、桩头接头处防水卷材的收口处打密封胶;S5、将喉箍安装在收口位置,拧紧后再进行一次密封胶封闭处理;S6、混凝土面层浇筑;本发明提供了一种便于现场施工,操作简单,桩头接头处衔接更为紧密的防水施工方法。
Waterproof construction method suitable for pile head connector
一种适用于桩头接头处的防水施工方法
ZHANG DENGYU (Autor:in) / HU SHANXI (Autor:in) / LI MENGMENG (Autor:in) / LI JIANQUAN (Autor:in)
01.10.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for pile head secondary forming waterproof construction
Europäisches Patentamt | 2020
|Pile head waterproof prefabricated part, waterproof structure and construction method thereof
Europäisches Patentamt | 2024
|Pile head waterproof structure and construction method thereof
Europäisches Patentamt | 2020
|Pile head waterproof treatment structure and construction method
Europäisches Patentamt | 2021
|