Double-pipe-rack slip form trolley and double-pipe-rack construction method
The invention discloses a double-pipe-gallery slip form trolley and a double-pipe-gallery construction method, and relates to the field of constructional engineering equipment.The double-pipe-gallery slip form trolley comprises a bottom plate, an inner form trolley is installed at the top of the bottom plate, and a gas cabin trolley installed on the bottom plate is arranged on one side of the inner form trolley. According to the construction method, a pouring cavity of an M structure can be defined through the arrangement of the gas cabin trolley, the outer mold trolley and the inner mold trolley, so that the pipe gallery can be poured out, the stability of the gas cabin trolley, the outer mold trolley and the outer mold trolley during pouring can be guaranteed through the arrangement of the pull rod, the bottom pull rod and the top pull rod, and construction is facilitated. The construction method is simple in operation and convenient to construct, loss of redundant formworks and use of sporadic materials are avoided in the construction process, material cutting, waste and the like caused by wood formwork construction are avoided, and meanwhile environmental pollution caused by dust raising and formwork explosion caused by wood formwork cutting, supporting, demolding and the like is controlled.
本发明公开了一种双管廊滑模台车及双管廊施工方法,涉及到建筑工程设备领域,包括底板,所述底板的顶部安装有内模台车,所述内模台车的一侧设置有安装在底板上的燃气舱台车。本发明中,通过燃气舱台车、外模台车和外模台车的设置可以围成M结构的浇筑腔,从而可以浇筑出管廊,通过对拉杆、底部拉杆和顶部拉杆的设置,可以保证燃气舱台车、外模台车和外模台车在浇筑时的稳定性,便于进行施工,本发明的施工方法,操作简单,便于进行施工,且在施工中,没有多余模板损耗、零星材料的使用,避免了采用木模板施工的材料切割、浪费等,同时控制了因木模板切割、支护、脱模等引起的扬尘和爆模引起的环境污染。
Double-pipe-rack slip form trolley and double-pipe-rack construction method
The invention discloses a double-pipe-gallery slip form trolley and a double-pipe-gallery construction method, and relates to the field of constructional engineering equipment.The double-pipe-gallery slip form trolley comprises a bottom plate, an inner form trolley is installed at the top of the bottom plate, and a gas cabin trolley installed on the bottom plate is arranged on one side of the inner form trolley. According to the construction method, a pouring cavity of an M structure can be defined through the arrangement of the gas cabin trolley, the outer mold trolley and the inner mold trolley, so that the pipe gallery can be poured out, the stability of the gas cabin trolley, the outer mold trolley and the outer mold trolley during pouring can be guaranteed through the arrangement of the pull rod, the bottom pull rod and the top pull rod, and construction is facilitated. The construction method is simple in operation and convenient to construct, loss of redundant formworks and use of sporadic materials are avoided in the construction process, material cutting, waste and the like caused by wood formwork construction are avoided, and meanwhile environmental pollution caused by dust raising and formwork explosion caused by wood formwork cutting, supporting, demolding and the like is controlled.
本发明公开了一种双管廊滑模台车及双管廊施工方法,涉及到建筑工程设备领域,包括底板,所述底板的顶部安装有内模台车,所述内模台车的一侧设置有安装在底板上的燃气舱台车。本发明中,通过燃气舱台车、外模台车和外模台车的设置可以围成M结构的浇筑腔,从而可以浇筑出管廊,通过对拉杆、底部拉杆和顶部拉杆的设置,可以保证燃气舱台车、外模台车和外模台车在浇筑时的稳定性,便于进行施工,本发明的施工方法,操作简单,便于进行施工,且在施工中,没有多余模板损耗、零星材料的使用,避免了采用木模板施工的材料切割、浪费等,同时控制了因木模板切割、支护、脱模等引起的扬尘和爆模引起的环境污染。
Double-pipe-rack slip form trolley and double-pipe-rack construction method
一种双管廊滑模台车及双管廊施工方法
YANG GANG (Autor:in) / LI ZHOUYANG (Autor:in) / GONG MINGHONG (Autor:in) / GAO YUNTAI (Autor:in) / JIA CHAOLIN (Autor:in) / XIAO LI (Autor:in)
01.10.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Combined template used for pipe rack construction and pipe rack construction method
Europäisches Patentamt | 2020
|External formwork trolley with raining proof operation function for pipe rack construction
Europäisches Patentamt | 2020
|