Construction method of suspended large-span reinforced concrete conversion truss girder
The invention discloses a construction method of a suspended large-span reinforced concrete conversion truss girder. The construction method comprises the following steps of pouring concrete of shear walls on two sides to delta 10.00; erecting a high-formwork bent frame and installing a bottom formwork of a lower chord beam; binding the lower chord beam and shear wall steel bars; sealing side formworks of the lower chord beam; sealing the formwork of the shear walls; inserting joint bar in inclined web columns and beam upper columns; pouring the lower chord beam and shear wall concrete; curing; butt welding and binding inclined web columns and beam upper column steel bars; sealing the column formwork ; pouring column concrete; curing; installing the bottom formwork of the upper chord beam; binding the upper chord beam and shear wall steel bar; sealing the side formwork of the upper chord beam; sealing the formwork of the shear wall; inserting joint bar in the beam upper columns; pouring the upper chord beam and the shear wall concrete and curing. The construction method is shorter in construction period, safe, reliable, lower in cost and convenient to construct.
本发明公开了一种悬空大跨度钢筋砼转换桁架梁施工方法,包括下列步骤:浇筑两侧剪力墙砼至▽10.00→搭设高支模排架,安装下弦梁底模→绑扎下弦梁、剪力墙钢筋→下弦梁封侧模,剪力墙封模→斜腹柱、梁上柱插筋→浇筑下弦梁、剪力墙砼→养护→斜腹柱、梁上柱钢筋对焊、绑扎→封柱模→浇筑柱砼→养护→安装上弦梁底模→绑扎上弦梁、剪力墙钢筋→上弦梁封侧模,剪力墙封模→梁上柱插筋→浇筑上弦梁、剪力墙砼→养护。本发明工期较短、安全可靠、成本较低、施工方便。
Construction method of suspended large-span reinforced concrete conversion truss girder
The invention discloses a construction method of a suspended large-span reinforced concrete conversion truss girder. The construction method comprises the following steps of pouring concrete of shear walls on two sides to delta 10.00; erecting a high-formwork bent frame and installing a bottom formwork of a lower chord beam; binding the lower chord beam and shear wall steel bars; sealing side formworks of the lower chord beam; sealing the formwork of the shear walls; inserting joint bar in inclined web columns and beam upper columns; pouring the lower chord beam and shear wall concrete; curing; butt welding and binding inclined web columns and beam upper column steel bars; sealing the column formwork ; pouring column concrete; curing; installing the bottom formwork of the upper chord beam; binding the upper chord beam and shear wall steel bar; sealing the side formwork of the upper chord beam; sealing the formwork of the shear wall; inserting joint bar in the beam upper columns; pouring the upper chord beam and the shear wall concrete and curing. The construction method is shorter in construction period, safe, reliable, lower in cost and convenient to construct.
本发明公开了一种悬空大跨度钢筋砼转换桁架梁施工方法,包括下列步骤:浇筑两侧剪力墙砼至▽10.00→搭设高支模排架,安装下弦梁底模→绑扎下弦梁、剪力墙钢筋→下弦梁封侧模,剪力墙封模→斜腹柱、梁上柱插筋→浇筑下弦梁、剪力墙砼→养护→斜腹柱、梁上柱钢筋对焊、绑扎→封柱模→浇筑柱砼→养护→安装上弦梁底模→绑扎上弦梁、剪力墙钢筋→上弦梁封侧模,剪力墙封模→梁上柱插筋→浇筑上弦梁、剪力墙砼→养护。本发明工期较短、安全可靠、成本较低、施工方便。
Construction method of suspended large-span reinforced concrete conversion truss girder
悬空大跨度钢筋砼转换桁架梁施工方法
LU FENG (Autor:in) / ZHU CHEN (Autor:in) / GU MINMIN (Autor:in) / ZHOU PING (Autor:in) / ZHANG LIQING (Autor:in)
01.10.2021
Patent
Elektronische Ressource
Chinesisch
Large-span steel truss girder single-cantilever construction method
Europäisches Patentamt | 2020
|Large-span curve steel truss girder construction system and construction method
Europäisches Patentamt | 2022
|Large-span steel truss girder floating towing erection construction method
Europäisches Patentamt | 2020
|