Stable bridge tower pier based on complex pier beam and manufacturing process of stable bridge tower pier
The invention discloses a stable bridge tower pier based on complex pier beams, which comprises a group of pier beam consolidation sections, a bottom plate unit, an in-box plate unit, a main beam, a group of in-box supports, a middle bridge deck and a group of overhanging bridge deck assemblies, the pier beam consolidation sections are oppositely arranged, the bottom plate unit is arranged above the pier beam consolidation sections, the in-box plate unit is arranged above the bottom plate unit, the main beams is arranged on the bottom plate unit and arranged at the two ends of the in-box plate unit, the in-box supports are arranged on the bottom plate unit, arranged on the outer side of the in-box plate unit and arranged between the two pier beam consolidation sections, and the middle bridge deck is arranged above the in-box plate unit and arranged between the two pier beam consolidation sections. The overhanging bridge deck assembly is arranged on the side, away from the middle bridge deck, of the pier beam consolidation section. By optimizing the structure of the tower pier and arranging the pier beam consolidation section, the supporting performance of the tower pier is improved, meanwhile, the structure further improves the supporting capacity of a bridge floor, and deformation of the tower pier in the construction and use process is effectively prevented.
本发明公开了一种基于复杂墩梁的稳定式桥塔墩,包括:一组墩梁固结段、底板单元、箱内板单元、主梁、一组箱内支撑、中间桥面板和一组悬挑桥面板组件,墩梁固结段相对设置,底板单元设于墩梁固结段的上方,箱内板单元设于底板单元的上方,主梁设于底板单元上,并设于箱内板单元的两端,箱内支撑设于底板单元上,并置于箱内板单元的外侧,且设于两墩梁固结段之间,中间桥面板设于箱内板单元的上方,并置于两墩梁固结段之间,悬挑桥面板组件设于墩梁固结段远离中间桥面板一侧。本发明通过对塔墩的结构进行优化,墩梁固结段的设置,提高了塔墩的支撑性能,同时,该结构还提高了桥面的支撑能力,有效的防止其施工和使用过程中出现变形。
Stable bridge tower pier based on complex pier beam and manufacturing process of stable bridge tower pier
The invention discloses a stable bridge tower pier based on complex pier beams, which comprises a group of pier beam consolidation sections, a bottom plate unit, an in-box plate unit, a main beam, a group of in-box supports, a middle bridge deck and a group of overhanging bridge deck assemblies, the pier beam consolidation sections are oppositely arranged, the bottom plate unit is arranged above the pier beam consolidation sections, the in-box plate unit is arranged above the bottom plate unit, the main beams is arranged on the bottom plate unit and arranged at the two ends of the in-box plate unit, the in-box supports are arranged on the bottom plate unit, arranged on the outer side of the in-box plate unit and arranged between the two pier beam consolidation sections, and the middle bridge deck is arranged above the in-box plate unit and arranged between the two pier beam consolidation sections. The overhanging bridge deck assembly is arranged on the side, away from the middle bridge deck, of the pier beam consolidation section. By optimizing the structure of the tower pier and arranging the pier beam consolidation section, the supporting performance of the tower pier is improved, meanwhile, the structure further improves the supporting capacity of a bridge floor, and deformation of the tower pier in the construction and use process is effectively prevented.
本发明公开了一种基于复杂墩梁的稳定式桥塔墩,包括:一组墩梁固结段、底板单元、箱内板单元、主梁、一组箱内支撑、中间桥面板和一组悬挑桥面板组件,墩梁固结段相对设置,底板单元设于墩梁固结段的上方,箱内板单元设于底板单元的上方,主梁设于底板单元上,并设于箱内板单元的两端,箱内支撑设于底板单元上,并置于箱内板单元的外侧,且设于两墩梁固结段之间,中间桥面板设于箱内板单元的上方,并置于两墩梁固结段之间,悬挑桥面板组件设于墩梁固结段远离中间桥面板一侧。本发明通过对塔墩的结构进行优化,墩梁固结段的设置,提高了塔墩的支撑性能,同时,该结构还提高了桥面的支撑能力,有效的防止其施工和使用过程中出现变形。
Stable bridge tower pier based on complex pier beam and manufacturing process of stable bridge tower pier
一种基于复杂墩梁的稳定式桥塔墩及其制作工艺
LIU XIAOPING (Autor:in) / TIAN QIANG (Autor:in) / ZHOU JIAN (Autor:in) / XU JIAN (Autor:in) / WANG FANG (Autor:in)
08.10.2021
Patent
Elektronische Ressource
Chinesisch
STABLE BRIDGE TOWER PIER BASED ON COMPLEX PIER BEAM AND MANUFACTURING PROCESS THEREFOR
Europäisches Patentamt | 2023
|New pier constructed under tilted bridge tower
Engineering Index Backfile | 1934
|Partially cable-stayed bridge tower beam pier consolidation system
Europäisches Patentamt | 2022
|