Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hole plugging device and building floor stand pipe hole plugging construction method
The invention provides a hole plugging device and a building floor stand pipe hole plugging construction method. The hole plugging device comprises a splayed frame, a sleeve, a height difference flitch plate, a supporting frame body, a plurality of tie bars and a plurality of distance compensators. The height difference flitch plate is arranged on the sleeve in a sleeving manner. The two ends of each tie bar penetrate through the top and the bottom of the sleeve at intervals, the bottom end of each tie bar is connected to a middle frame body of the splayed frame, and the tops of the frame bodies on the two sides of the splayed frame are connected to the two side ends of the bottom of the height difference flitch plate. The supporting frame body is mounted on the upper surface of the height difference flitch plate, and the upper part of the sleeve is positioned in the supporting frame body. The top of each tie bar is connected to the supporting frame body through the corresponding distance compensator. The device is simple in structure and convenient to use.
本申请提供一种洞口封堵装置及建筑楼板立管洞口封堵施工方法,其包括八字架、套管、高差贴板、支撑架体、多个拉结筋以及多个距离补偿器;高差贴板套设于套管上;多个拉结筋的两端分别间隔地穿过套管的顶底,且每个拉结筋的底端均连接于八字架的中部架体上,八字架的两侧架体的顶部连接于高差贴板的底部两侧端上;支撑架体安装于高差贴板的上表面上,且套管的上部处于支撑架体内;每个拉结筋的顶部均通过相对应的距离补偿器连接于支撑架体上。该装置结构简单,且使用方便。
Hole plugging device and building floor stand pipe hole plugging construction method
The invention provides a hole plugging device and a building floor stand pipe hole plugging construction method. The hole plugging device comprises a splayed frame, a sleeve, a height difference flitch plate, a supporting frame body, a plurality of tie bars and a plurality of distance compensators. The height difference flitch plate is arranged on the sleeve in a sleeving manner. The two ends of each tie bar penetrate through the top and the bottom of the sleeve at intervals, the bottom end of each tie bar is connected to a middle frame body of the splayed frame, and the tops of the frame bodies on the two sides of the splayed frame are connected to the two side ends of the bottom of the height difference flitch plate. The supporting frame body is mounted on the upper surface of the height difference flitch plate, and the upper part of the sleeve is positioned in the supporting frame body. The top of each tie bar is connected to the supporting frame body through the corresponding distance compensator. The device is simple in structure and convenient to use.
本申请提供一种洞口封堵装置及建筑楼板立管洞口封堵施工方法,其包括八字架、套管、高差贴板、支撑架体、多个拉结筋以及多个距离补偿器;高差贴板套设于套管上;多个拉结筋的两端分别间隔地穿过套管的顶底,且每个拉结筋的底端均连接于八字架的中部架体上,八字架的两侧架体的顶部连接于高差贴板的底部两侧端上;支撑架体安装于高差贴板的上表面上,且套管的上部处于支撑架体内;每个拉结筋的顶部均通过相对应的距离补偿器连接于支撑架体上。该装置结构简单,且使用方便。
Hole plugging device and building floor stand pipe hole plugging construction method
一种洞口封堵装置及建筑楼板立管洞口封堵施工方法
LU JIAWEI (Autor:in) / GAN YANSHENG (Autor:in) / LU BINGKUI (Autor:in) / ZHAO YING (Autor:in)
08.10.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Floor preformed hole plugging device and plugging method thereof
Europäisches Patentamt | 2023
|