Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
MMA rock slice terrace and construction method thereof
The invention particularly relates to an MMA rock slice terrace and a construction method thereof. The problems that existing terrace coating is poor in environment tolerance, not easy to construct at low temperature and complex in construction are solved. According to the MMA rock slice terrace, a primer sealing layer is laid on the upper surface of a base layer, a middle coating layer is laid on the upper surface of the primer sealing layer, a composite rock slice layer is laid on the upper surface of the middle coating layer, and a cover face protection layer is laid on the upper surface of the composite rock slice layer. The construction method of the MMA rock slice terrace comprises the steps that S1, the primer sealing layer is laid on the upper surface of the base layer; S2, the middle coating layer is prepared; S3, the upper surface of the primer sealing layer is evenly coated with a mixture obtained in the step S2 in a scraping mode; S4, composite rock slices are evenly spread on the upper surface of the middle coating layer before curing; S5, the upper surface of the composite rock slice layer is polished through a polishing machine, and then sweeping and dust collection are carried out; and S6, the cover face protection layer is constructed. The construction process is simple and feasible, the construction cost is reduced, and the beneficial effect of being long in service life is achieved.
本发明具体是一种MMA岩片地坪及其施工方法,解决了现有地坪涂料环境耐受性差、低温时不易施工、施工复杂的问题。一种MMA岩片地坪,基层的上表面铺设有底漆封闭层,底漆封闭层的上表面铺设有中间涂料层,中间涂料层的上表面铺设有复合岩片层,复合岩片层的上表面铺设有罩面保护层。一种MMA岩片地坪的施工方法,S1:在基层的上表面铺设底漆封闭层;S2:中间涂料层的制备;S3:将S2得到的混合物均匀刮涂在底漆封闭层的上表面;S4:在中间涂料层固化前的上表面均匀撒布复合岩片;S5:使用打磨机打磨复合岩片层的上表面,然后清扫、吸尘;S6:罩面保护层的施工。本发明施工工艺简单可行,降低了施工成本,具有使用寿命长的优点。
MMA rock slice terrace and construction method thereof
The invention particularly relates to an MMA rock slice terrace and a construction method thereof. The problems that existing terrace coating is poor in environment tolerance, not easy to construct at low temperature and complex in construction are solved. According to the MMA rock slice terrace, a primer sealing layer is laid on the upper surface of a base layer, a middle coating layer is laid on the upper surface of the primer sealing layer, a composite rock slice layer is laid on the upper surface of the middle coating layer, and a cover face protection layer is laid on the upper surface of the composite rock slice layer. The construction method of the MMA rock slice terrace comprises the steps that S1, the primer sealing layer is laid on the upper surface of the base layer; S2, the middle coating layer is prepared; S3, the upper surface of the primer sealing layer is evenly coated with a mixture obtained in the step S2 in a scraping mode; S4, composite rock slices are evenly spread on the upper surface of the middle coating layer before curing; S5, the upper surface of the composite rock slice layer is polished through a polishing machine, and then sweeping and dust collection are carried out; and S6, the cover face protection layer is constructed. The construction process is simple and feasible, the construction cost is reduced, and the beneficial effect of being long in service life is achieved.
本发明具体是一种MMA岩片地坪及其施工方法,解决了现有地坪涂料环境耐受性差、低温时不易施工、施工复杂的问题。一种MMA岩片地坪,基层的上表面铺设有底漆封闭层,底漆封闭层的上表面铺设有中间涂料层,中间涂料层的上表面铺设有复合岩片层,复合岩片层的上表面铺设有罩面保护层。一种MMA岩片地坪的施工方法,S1:在基层的上表面铺设底漆封闭层;S2:中间涂料层的制备;S3:将S2得到的混合物均匀刮涂在底漆封闭层的上表面;S4:在中间涂料层固化前的上表面均匀撒布复合岩片;S5:使用打磨机打磨复合岩片层的上表面,然后清扫、吸尘;S6:罩面保护层的施工。本发明施工工艺简单可行,降低了施工成本,具有使用寿命长的优点。
MMA rock slice terrace and construction method thereof
一种MMA岩片地坪及其施工方法
XUE XIAODONG (Autor:in) / GAO WEI (Autor:in) / DU LIMIN (Autor:in) / GUAN LASHENG (Autor:in) / QI XIAOJING (Autor:in) / WANG XIA (Autor:in)
12.10.2021
Patent
Elektronische Ressource
Chinesisch
High-precision natural rock color terrace construction method
Europäisches Patentamt | 2023
|Terrace construction adjustable template and construction method thereof
Europäisches Patentamt | 2015
|Drain board, terrace and construction method of terrace
Europäisches Patentamt | 2023
|