Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Auxiliary tool for plastering at wire box
The embodiment of the invention discloses an auxiliary tool for plastering at a wire box. Before plastering, an elastic piece is deformed by pressing a handheld end, then a first end of a cross structure extends into the wire box, a panel and a plastering surface are adjusted to be located on the same plane, the handheld end of a clamping structure is loosened, the first end of the cross structure is in contact with the inner wall of the wire box under the action of the elastic restoring force of the elastic piece, and the panel is prevented from being separated from the wire box under the action of the friction force between the first end of the cross structure and the inner wall of the wire box; and due to the fact that the panel and the plastering surface are located on the same plane, the panel can prevent mortar from entering the wire box; and after plastering is completed, the elastic piece is deformed by pressing the handheld end, external tension is applied to a second end of the cross structure, so that the panel and the first end of the cross structure are moved out of the wire box, and then the wire box is taken out. Compared with the prior art, the auxiliary tool has the advantages that the wire box can be prevented from being polluted by the mortar, and the closing quality of the wire box can be guaranteed.
本发明实施例公开了一种线盒处抹灰辅助工具。在抹灰前,通过按压手持端,使得弹性件产生形变,然后将交叉结构的第一端伸入线盒内,调整面板与抹灰表面处于同一平面,松开夹持结构的手持端,在弹性件的弹性回复力作用下,交叉结构的第一端与线盒内壁接触,并在交叉结构的第一端与线盒内壁的摩擦力作用下,避免面板从线盒中脱出,由于面板与抹灰表面处于同一平面,因此,面板可以避免砂浆进入线盒,而在抹灰完毕后,通过按压手持端,使弹性件产生形变,通过对交叉结构的第二端施加外拉力,使面板和交叉结构的第一端移出至线盒外,即完成取出,相较于现有技术,本申请不仅能够保证线盒不受砂浆污染,还能保证线盒收口质量。
Auxiliary tool for plastering at wire box
The embodiment of the invention discloses an auxiliary tool for plastering at a wire box. Before plastering, an elastic piece is deformed by pressing a handheld end, then a first end of a cross structure extends into the wire box, a panel and a plastering surface are adjusted to be located on the same plane, the handheld end of a clamping structure is loosened, the first end of the cross structure is in contact with the inner wall of the wire box under the action of the elastic restoring force of the elastic piece, and the panel is prevented from being separated from the wire box under the action of the friction force between the first end of the cross structure and the inner wall of the wire box; and due to the fact that the panel and the plastering surface are located on the same plane, the panel can prevent mortar from entering the wire box; and after plastering is completed, the elastic piece is deformed by pressing the handheld end, external tension is applied to a second end of the cross structure, so that the panel and the first end of the cross structure are moved out of the wire box, and then the wire box is taken out. Compared with the prior art, the auxiliary tool has the advantages that the wire box can be prevented from being polluted by the mortar, and the closing quality of the wire box can be guaranteed.
本发明实施例公开了一种线盒处抹灰辅助工具。在抹灰前,通过按压手持端,使得弹性件产生形变,然后将交叉结构的第一端伸入线盒内,调整面板与抹灰表面处于同一平面,松开夹持结构的手持端,在弹性件的弹性回复力作用下,交叉结构的第一端与线盒内壁接触,并在交叉结构的第一端与线盒内壁的摩擦力作用下,避免面板从线盒中脱出,由于面板与抹灰表面处于同一平面,因此,面板可以避免砂浆进入线盒,而在抹灰完毕后,通过按压手持端,使弹性件产生形变,通过对交叉结构的第二端施加外拉力,使面板和交叉结构的第一端移出至线盒外,即完成取出,相较于现有技术,本申请不仅能够保证线盒不受砂浆污染,还能保证线盒收口质量。
Auxiliary tool for plastering at wire box
一种线盒处抹灰辅助工具
15.10.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Plastering auxiliary device for building construction
Europäisches Patentamt | 2024
|