Treatment method for slab bottom gap of bridge hollow slab
The invention discloses a treatment method for a slab bottom gap of a bridge hollow slab. The treatment method comprises the following steps that S1 preparing treatment materials needed for construction; S2 supporting and cushioning supporting legs of a movable scaffold through wood plates; S3 cleaning mortar and sundries exposed in the pasting range of the gap away through an iron shovel and a steel wire brush, and wetting and scrubbing dust in the pasting range through wet cloth; S4 popping a sticking edge line out of a pasting position at the bottom of the board by adopting an ink fountain, sticking a waterproof roll adhesive layer at the pasting position, and cutting the redundant waterproof roll adhesive layer; and S5 using a kneading tool to perform kneading treatment at the pasting position. According to the treatment method, the problems that in the gap treatment process, the adhesion force of hollow slabs is often not enough, durability is not high, vibration impact is caused to beam slabs when vehicles pass through, the falling phenomenon is likely to happen, maintenance needs to be conducted in the later period, and the construction cost is increased are solved.
本申请公开了一种桥梁空心板板底缝隙的处理方法,包括以下步骤:S1施工需要的处理材料进行准备;S2将移动脚手架的支腿采用木板进行支垫,S3使用铁铲、钢丝刷对缝隙的粘贴范围内外露的砂浆及杂物清理,用湿布将粘贴范围内的灰尘湿润和擦洗;S4采用墨斗将粘贴边缘线在板底弹出粘贴位置,在粘贴位置处粘贴防水卷材胶层,并将多余的防水卷材胶层剪裁处理;S5使用揉压工具,在粘贴位置处进行揉压处理。该处理方法解决了在缝隙处理时往往空心板的粘贴力不够,耐久性不高,在车辆通过时,对梁板进行造成振动冲击,容易发生脱落现象,导致后期需要进行维修,增加了施工的成本的问题。
Treatment method for slab bottom gap of bridge hollow slab
The invention discloses a treatment method for a slab bottom gap of a bridge hollow slab. The treatment method comprises the following steps that S1 preparing treatment materials needed for construction; S2 supporting and cushioning supporting legs of a movable scaffold through wood plates; S3 cleaning mortar and sundries exposed in the pasting range of the gap away through an iron shovel and a steel wire brush, and wetting and scrubbing dust in the pasting range through wet cloth; S4 popping a sticking edge line out of a pasting position at the bottom of the board by adopting an ink fountain, sticking a waterproof roll adhesive layer at the pasting position, and cutting the redundant waterproof roll adhesive layer; and S5 using a kneading tool to perform kneading treatment at the pasting position. According to the treatment method, the problems that in the gap treatment process, the adhesion force of hollow slabs is often not enough, durability is not high, vibration impact is caused to beam slabs when vehicles pass through, the falling phenomenon is likely to happen, maintenance needs to be conducted in the later period, and the construction cost is increased are solved.
本申请公开了一种桥梁空心板板底缝隙的处理方法,包括以下步骤:S1施工需要的处理材料进行准备;S2将移动脚手架的支腿采用木板进行支垫,S3使用铁铲、钢丝刷对缝隙的粘贴范围内外露的砂浆及杂物清理,用湿布将粘贴范围内的灰尘湿润和擦洗;S4采用墨斗将粘贴边缘线在板底弹出粘贴位置,在粘贴位置处粘贴防水卷材胶层,并将多余的防水卷材胶层剪裁处理;S5使用揉压工具,在粘贴位置处进行揉压处理。该处理方法解决了在缝隙处理时往往空心板的粘贴力不够,耐久性不高,在车辆通过时,对梁板进行造成振动冲击,容易发生脱落现象,导致后期需要进行维修,增加了施工的成本的问题。
Treatment method for slab bottom gap of bridge hollow slab
一种桥梁空心板板底缝隙的处理方法
WANG CHENG (Autor:in) / WANG JIANFENG (Autor:in) / ZHANG LIANG (Autor:in) / GU LONG (Autor:in) / XIA DONGSHENG (Autor:in) / WANG XIAO (Autor:in) / SUN XU (Autor:in) / SONG JINHE (Autor:in) / LIU XINHU (Autor:in) / MA GUODONG (Autor:in)
19.10.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Hollow slab bridge maintenance method and hollow slab bridge
Europäisches Patentamt | 2023
|Hollow slab bridge reinforcing structure and hollow slab bridge reinforcing method
Europäisches Patentamt | 2023
|Novel prefabricated hollow slab and hollow slab bridge construction method using same