Construction method for reusing concrete reinforcing bars of construction hardened ground
The invention relates to a construction method for reusing concrete reinforcing bars of a construction hardened ground, and belongs to the technical field of building construction, the construction method comprises the following steps: S1, leveling a site: leveling the ground in a manual and mechanical manner; S2, performing road subgrade rolling, wherein plain soil is adopted for rolling, and silt and other soil which does not conform to the construction specification cannot be used in a road subgrade filling area; S3, reinforcement: selecting A8-200 reinforcements during reinforcement of the temporary pavement, and reasonably arranging double rows of reinforcements according to the thickness of the temporary pavement; S4, arranging a plurality of square steel sleeves in the steel bars of the temporary pavement; S5, fixedly arranging a lifting hook in the square steel sleeve; S6, erecting a formwork, and pouring concrete; S7, when the temporary pavement is not needed, cutting the temporary pavement according to a certain specification to form a plurality of temporary panels; and S8, uniformly arranging the plurality of cut temporary panels in a stacking area. The method has the effect of saving cost.
本申请涉及一种施工硬化地面混凝土配筋再利用的施工方法,属于建筑施工的技术领域,其包括以下步骤:S1:平整场地:采用人工和机械的方式将地面整平;S2:道路路基:采用素土碾压,道路路基填方区域不得使用淤泥等不符合施工规范的土壤;S3:配筋:临时路面配筋时选择A8@200钢筋,并且根据临时路面的厚度合理安排双排配筋;S4:在临时路面的钢筋内布设多个方钢套管;S5:方钢套管内固设有吊钩;S6:支模并浇筑混凝土;S7:不需要临时路面时,将临时路面按照一定的规格进行切割,形成多块临时面板;S8:将切割后的多块临时面板统一安排在堆放区。本申请具有节约成本的效果。
Construction method for reusing concrete reinforcing bars of construction hardened ground
The invention relates to a construction method for reusing concrete reinforcing bars of a construction hardened ground, and belongs to the technical field of building construction, the construction method comprises the following steps: S1, leveling a site: leveling the ground in a manual and mechanical manner; S2, performing road subgrade rolling, wherein plain soil is adopted for rolling, and silt and other soil which does not conform to the construction specification cannot be used in a road subgrade filling area; S3, reinforcement: selecting A8-200 reinforcements during reinforcement of the temporary pavement, and reasonably arranging double rows of reinforcements according to the thickness of the temporary pavement; S4, arranging a plurality of square steel sleeves in the steel bars of the temporary pavement; S5, fixedly arranging a lifting hook in the square steel sleeve; S6, erecting a formwork, and pouring concrete; S7, when the temporary pavement is not needed, cutting the temporary pavement according to a certain specification to form a plurality of temporary panels; and S8, uniformly arranging the plurality of cut temporary panels in a stacking area. The method has the effect of saving cost.
本申请涉及一种施工硬化地面混凝土配筋再利用的施工方法,属于建筑施工的技术领域,其包括以下步骤:S1:平整场地:采用人工和机械的方式将地面整平;S2:道路路基:采用素土碾压,道路路基填方区域不得使用淤泥等不符合施工规范的土壤;S3:配筋:临时路面配筋时选择A8@200钢筋,并且根据临时路面的厚度合理安排双排配筋;S4:在临时路面的钢筋内布设多个方钢套管;S5:方钢套管内固设有吊钩;S6:支模并浇筑混凝土;S7:不需要临时路面时,将临时路面按照一定的规格进行切割,形成多块临时面板;S8:将切割后的多块临时面板统一安排在堆放区。本申请具有节约成本的效果。
Construction method for reusing concrete reinforcing bars of construction hardened ground
一种施工硬化地面混凝土配筋再利用的施工方法
HE LONGFEI (Autor:in) / YU KUN (Autor:in) / LI ZHIXUN (Autor:in) / WANG CONG (Autor:in) / LU QING (Autor:in) / XU XIAOMING (Autor:in) / SONG WENQI (Autor:in)
26.10.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Bond of concrete reinforcing bars
Engineering Index Backfile | 1949
|Europäisches Patentamt | 2022
|Bond of concrete reinforcing bars
Engineering Index Backfile | 1949
|