Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Energy-saving double-layer suspended ceiling and construction method thereof
The invention provides an energy-saving double-layer suspended ceiling and a construction method thereof. The energy-saving double-layer suspended ceiling is characterized by comprising a steel frame transfer layer, a lead screw, a hoisting assembly, a hanging piece, a hoisting main keel, a keel frame, a high crystal plate, a clamping type keel and a U-shaped aluminum square tube; the lead screw is located below the steel frame transfer layer, and the upper end of the lead screw is fixed to the steel frame transfer layer; the hoisting assembly is installed at the upper section position of the lead screw; the hoisting main keel is installed through the hoisting assembly; the keel frame is arranged below the hoisting assembly and installed on the hoisted main keel through the hanging piece; the high crystal plate is installed on the keel frame; the clamping type keel is fixed to the lower end of the lead screw; and a plurality of clamping grooves are formed in the clamping type keel, the U-shaped aluminum square tube is provided with a clamping edge, and the U-shaped aluminum square tube is installed below the clamping type keel in a clamped connection mode through matching of the clamping edge and the clamping grooves.
本发明提供一种节能型双层吊顶及其施工方法。该节能型双层吊顶,具有这样的特征,包括:钢架转换层、丝杆、吊装组件、挂件、吊装主龙骨、龙骨框架、高晶板、卡式龙骨以及U型铝方通;丝杆位于钢架转换层下方,丝杆的上端头固定在钢架转换层上;吊装组件安装在丝杆的上段位置;吊装主龙骨通过吊装组件安装;龙骨框架设置在吊装组件的下方,通过挂件安装在所吊装主龙骨上;高晶板安装在龙骨框架上;卡式龙骨与丝杆的下端头相固定;卡式龙骨的上开设有若干卡槽,U型铝方通具有卡合边,U型铝方通通过卡合边与卡槽相匹配卡接安装在卡式龙骨的下方。
Energy-saving double-layer suspended ceiling and construction method thereof
The invention provides an energy-saving double-layer suspended ceiling and a construction method thereof. The energy-saving double-layer suspended ceiling is characterized by comprising a steel frame transfer layer, a lead screw, a hoisting assembly, a hanging piece, a hoisting main keel, a keel frame, a high crystal plate, a clamping type keel and a U-shaped aluminum square tube; the lead screw is located below the steel frame transfer layer, and the upper end of the lead screw is fixed to the steel frame transfer layer; the hoisting assembly is installed at the upper section position of the lead screw; the hoisting main keel is installed through the hoisting assembly; the keel frame is arranged below the hoisting assembly and installed on the hoisted main keel through the hanging piece; the high crystal plate is installed on the keel frame; the clamping type keel is fixed to the lower end of the lead screw; and a plurality of clamping grooves are formed in the clamping type keel, the U-shaped aluminum square tube is provided with a clamping edge, and the U-shaped aluminum square tube is installed below the clamping type keel in a clamped connection mode through matching of the clamping edge and the clamping grooves.
本发明提供一种节能型双层吊顶及其施工方法。该节能型双层吊顶,具有这样的特征,包括:钢架转换层、丝杆、吊装组件、挂件、吊装主龙骨、龙骨框架、高晶板、卡式龙骨以及U型铝方通;丝杆位于钢架转换层下方,丝杆的上端头固定在钢架转换层上;吊装组件安装在丝杆的上段位置;吊装主龙骨通过吊装组件安装;龙骨框架设置在吊装组件的下方,通过挂件安装在所吊装主龙骨上;高晶板安装在龙骨框架上;卡式龙骨与丝杆的下端头相固定;卡式龙骨的上开设有若干卡槽,U型铝方通具有卡合边,U型铝方通通过卡合边与卡槽相匹配卡接安装在卡式龙骨的下方。
Energy-saving double-layer suspended ceiling and construction method thereof
一种节能型双层吊顶及其施工方法
ZHANG WEI (Autor:in) / WANG FAKAI (Autor:in) / QIAN YUYONG (Autor:in) / ZHU LELE (Autor:in) / WANG FUZHOU (Autor:in) / WEN YANG (Autor:in) / AN QI (Autor:in) / QIN HONGWEI (Autor:in)
26.10.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Energy-saving suspended ceiling structure and construction method thereof
Europäisches Patentamt | 2022
|Energy-saving suspended ceiling structure and construction method thereof
Europäisches Patentamt | 2023
|Energy-saving suspended ceiling and construction method
Europäisches Patentamt | 2023
|Suspended ceiling module, suspended ceiling system and construction method thereof
Europäisches Patentamt | 2020
|