Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Vortex screw lifting elevator shaft creeping formwork system and operation method thereof
The invention relates to the field of building construction, in particular to a vortex screw lifting elevator shaft creeping formwork system and an operation method thereof. The ortex screw lifting elevator shaft creeping formwork system comprises a body, an upper climbing frame, a lower climbing frame and a linkage platform arranged between the upper climbing frame and the lower climbing frame are arranged on the body, and a lifting mechanism for driving the upper climbing frame or the lower climbing frame and the linkage platform to move synchronously is arranged on the linkage platform. The lifting mechanism drives the upper climbing frame and the lower climbing frame to linearly move back and forth in the elevator shaft direction. According to the vortex screw lifting elevator shaft creeping formwork system and the operation method thereof, the upper climbing frame, the lower climbing frame and the linkage platform arranged between the upper climbing frame and the lower climbing frame are arranged, a three-section structure is adopted, main components can be flexibly disassembled and assembled, use is convenient, the maintenance cost is low, and the weight is greatly reduced. In addition, lifting is conducted through a driving motor, a steering gear, a vortex screw and a vortex screw lifting machine, the lifting process is stable, errors are small, the adjusting time after lifting is shortened, the cost is reduced, and the construction progress is accelerated.
本发明涉及建筑施工领域,特别涉及到一种旋涡螺杆升降电梯井爬模系统及其操作方法。包括本体,所述本体上设有上爬升架、下爬升架和设置在上爬升架和下爬升架之间的联动平台,所述联动平台上设有驱动上爬升架或下爬升架与联动平台同步移动的提升机构,所述提升机构驱动上爬升架和下爬升架沿电梯井方向直线来回运动;通过设置上爬升架、下爬升架和设置在上爬升架和下爬升架之间的联动平台,采用三段式结构,主要构件可灵活拆分和拼装,使用方便且维护费用低,重量大大减轻。而且采用驱动电机、转向器、旋涡螺杆和旋涡螺杆提升机的方式进行提升,提升过程平稳,误差小,减少提升后的调整时间,降低成本,加快施工进度。
Vortex screw lifting elevator shaft creeping formwork system and operation method thereof
The invention relates to the field of building construction, in particular to a vortex screw lifting elevator shaft creeping formwork system and an operation method thereof. The ortex screw lifting elevator shaft creeping formwork system comprises a body, an upper climbing frame, a lower climbing frame and a linkage platform arranged between the upper climbing frame and the lower climbing frame are arranged on the body, and a lifting mechanism for driving the upper climbing frame or the lower climbing frame and the linkage platform to move synchronously is arranged on the linkage platform. The lifting mechanism drives the upper climbing frame and the lower climbing frame to linearly move back and forth in the elevator shaft direction. According to the vortex screw lifting elevator shaft creeping formwork system and the operation method thereof, the upper climbing frame, the lower climbing frame and the linkage platform arranged between the upper climbing frame and the lower climbing frame are arranged, a three-section structure is adopted, main components can be flexibly disassembled and assembled, use is convenient, the maintenance cost is low, and the weight is greatly reduced. In addition, lifting is conducted through a driving motor, a steering gear, a vortex screw and a vortex screw lifting machine, the lifting process is stable, errors are small, the adjusting time after lifting is shortened, the cost is reduced, and the construction progress is accelerated.
本发明涉及建筑施工领域,特别涉及到一种旋涡螺杆升降电梯井爬模系统及其操作方法。包括本体,所述本体上设有上爬升架、下爬升架和设置在上爬升架和下爬升架之间的联动平台,所述联动平台上设有驱动上爬升架或下爬升架与联动平台同步移动的提升机构,所述提升机构驱动上爬升架和下爬升架沿电梯井方向直线来回运动;通过设置上爬升架、下爬升架和设置在上爬升架和下爬升架之间的联动平台,采用三段式结构,主要构件可灵活拆分和拼装,使用方便且维护费用低,重量大大减轻。而且采用驱动电机、转向器、旋涡螺杆和旋涡螺杆提升机的方式进行提升,提升过程平稳,误差小,减少提升后的调整时间,降低成本,加快施工进度。
Vortex screw lifting elevator shaft creeping formwork system and operation method thereof
一种旋涡螺杆升降电梯井爬模系统及其操作方法
GAO WEIQUAN (Autor:in) / PENG HUI (Autor:in) / ZHU WENFEI (Autor:in) / TAN YU (Autor:in) / XIE YANYI (Autor:in) / YAO MUPING (Autor:in) / WANG PENG (Autor:in) / TONG CHAO (Autor:in)
05.11.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Elevator shaft formwork system and operation method thereof
Europäisches Patentamt | 2022
|Connecting structure of construction hoist and creeping formwork in elevator shaft
Europäisches Patentamt | 2020
|Elevator shaft creeping formwork integrated platform of movable arm material distributing machine
Europäisches Patentamt | 2023
|Elevator shaft operation platform and barrel formwork integrated lifting device and using method
Europäisches Patentamt | 2024
|Creeping formwork construction platform for ultra-small special-shaped unequal-width elevator shaft
Europäisches Patentamt | 2023
|