Steel member butt joint installation method, steel member auxiliary alignment base and manufacturing method of steel member auxiliary alignment base
The invention discloses a steel member butt joint installation method, a steel member auxiliary alignment base and a manufacturing method of the steel member auxiliary alignment base. The steel member auxiliary alignment base comprises a bottom steel plate, at least two sliding grooves are formed in the bottom steel plate, and all the sliding grooves are arranged in parallel; profile steel structures are arranged between every two adjacent sliding grooves, the length directions of the profile steel structures are arranged in the length directions of the sliding grooves, and the profile steel structures are welded to the bottom steel plate; a first jack is arranged in the sliding groove in a sliding mode, and a piston rod of the first jack is arranged in the length direction of the sliding groove; a counter-force baffle can be matched with the first jack; a second jack is connected with the first jack, a piston rod of the second jack is arranged in the vertical direction of a plane where the bottom steel plate is located, and the second jack is arranged in the sliding groove in a sliding mode. According to the steel member auxiliary alignment base, auxiliary alignment can be conducted on a steel member, alignment of manual rope pulling and crane matching is omitted, the butt joint installation efficiency of the steel member is improved, and the construction progress of a whole building is accelerated.
本发明公开了一种钢构件对接安装方法、钢构件辅助调准基座及其制造方法。该钢构件辅助调准基座包括底部钢板,底部钢板开设有至少两个滑槽,所有的滑槽均平行设置;设置于相邻的两个滑槽之间的型钢结构,型钢结构的长度方向沿滑槽的长度方向设置,型钢结构焊接于底部钢板;滑动设置于滑槽的第一千斤顶,第一千斤顶的活塞杆沿滑槽的长度方向设置;能够与第一千斤顶配合的反力挡板;以及与第一千斤顶连接的第二千斤顶,第二千斤顶的活塞杆沿底部钢板所在平面的垂直方向设置,第二千斤顶滑动设置于滑槽中。该钢构件辅助调准基座能对钢构件进行辅助调准,省去人工拉绳子与吊车配合的调准,提高了钢构件的对接安装效率,加快了整个建筑的施工进度。
Steel member butt joint installation method, steel member auxiliary alignment base and manufacturing method of steel member auxiliary alignment base
The invention discloses a steel member butt joint installation method, a steel member auxiliary alignment base and a manufacturing method of the steel member auxiliary alignment base. The steel member auxiliary alignment base comprises a bottom steel plate, at least two sliding grooves are formed in the bottom steel plate, and all the sliding grooves are arranged in parallel; profile steel structures are arranged between every two adjacent sliding grooves, the length directions of the profile steel structures are arranged in the length directions of the sliding grooves, and the profile steel structures are welded to the bottom steel plate; a first jack is arranged in the sliding groove in a sliding mode, and a piston rod of the first jack is arranged in the length direction of the sliding groove; a counter-force baffle can be matched with the first jack; a second jack is connected with the first jack, a piston rod of the second jack is arranged in the vertical direction of a plane where the bottom steel plate is located, and the second jack is arranged in the sliding groove in a sliding mode. According to the steel member auxiliary alignment base, auxiliary alignment can be conducted on a steel member, alignment of manual rope pulling and crane matching is omitted, the butt joint installation efficiency of the steel member is improved, and the construction progress of a whole building is accelerated.
本发明公开了一种钢构件对接安装方法、钢构件辅助调准基座及其制造方法。该钢构件辅助调准基座包括底部钢板,底部钢板开设有至少两个滑槽,所有的滑槽均平行设置;设置于相邻的两个滑槽之间的型钢结构,型钢结构的长度方向沿滑槽的长度方向设置,型钢结构焊接于底部钢板;滑动设置于滑槽的第一千斤顶,第一千斤顶的活塞杆沿滑槽的长度方向设置;能够与第一千斤顶配合的反力挡板;以及与第一千斤顶连接的第二千斤顶,第二千斤顶的活塞杆沿底部钢板所在平面的垂直方向设置,第二千斤顶滑动设置于滑槽中。该钢构件辅助调准基座能对钢构件进行辅助调准,省去人工拉绳子与吊车配合的调准,提高了钢构件的对接安装效率,加快了整个建筑的施工进度。
Steel member butt joint installation method, steel member auxiliary alignment base and manufacturing method of steel member auxiliary alignment base
钢构件对接安装方法、钢构件辅助调准基座及其制造方法
WANG MAN (Autor:in) / LI XIAOMING (Autor:in) / HUANG YUNCHANG (Autor:in) / ZHANG XIAONAN (Autor:in) / WU JING (Autor:in)
05.11.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
B66F
HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
,
Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last
Auxiliary device for steel structure butt joint installation
Europäisches Patentamt | 2023
|Steel member butt joint device and construction method thereof
Europäisches Patentamt | 2024
|JOINT STRUCTURE OF STEEL MEMBER AND JOINT METHOD OF STEEL MEMBER
Europäisches Patentamt | 2019
|Europäisches Patentamt | 2018
|INSTALLATION METHOD OF FOUNDATION PILE AND INSTALLATION AUXILIARY MEMBER
Europäisches Patentamt | 2015
|