Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Device for bridge jacking deviation rectification and usage method thereof
The invention discloses a device for bridge jacking deviation rectification and a usage method thereof.The device comprises a distribution beam and a bridge arranged above the distribution beam, a jacking jack is fixedly installed at the bottom of the distribution beam, and high-damping fixed plates are fixedly installed on the two sides of the top of the distribution beam correspondingly; stress cushion blocks are fixedly mounted on the two sides of the bottom of the bridge correspondingly, stainless steel plates are fixedly mounted at the bottoms of the two stress cushion blocks correspondingly, and the bottoms of the two stainless steel plates make contact with the tops of the two high-damping fixed plates correspondingly. According to the device for bridge jacking deviation rectification and the usage method thereof, through the arrangement of the automatic oil feeding and resistance reducing mechanism, lubricating oil can be conveniently added into the gap between the stainless steel plate and the high-damping fixed plate, then the load of the deviation rectification jack can be reduced, the whole bridge is easier to push, the service life of the deviation rectification jack is prolonged, and meanwhile the deviation rectification quality is improved.
本发明公开了一种用于桥梁顶升纠偏的装置及其使用方法,包括分配梁和设置在分配梁上方的桥梁,所述分配梁的底部固定安装有顶升千斤顶,所述分配梁顶部的两侧均固定安装有高阻尼固定板,所述桥梁底部的两侧均固定安装有受力垫块,两个所述受力垫块的底部均固定安装有不锈钢板,两个所述不锈钢板的底部分别与两个所述高阻尼固定板的顶部接触,本发明涉及构筑物顶升纠偏技术领域。该用于桥梁顶升纠偏的装置及其使用方法,通过自动上油减阻机构的设置,便于向不锈钢板与高阻尼固定板的间隙处添加润滑油,进而可减小纠偏千斤顶的负载,使得整个桥梁更加容易推动,提高纠偏千斤顶的使用寿命,同时提高纠偏质量。
Device for bridge jacking deviation rectification and usage method thereof
The invention discloses a device for bridge jacking deviation rectification and a usage method thereof.The device comprises a distribution beam and a bridge arranged above the distribution beam, a jacking jack is fixedly installed at the bottom of the distribution beam, and high-damping fixed plates are fixedly installed on the two sides of the top of the distribution beam correspondingly; stress cushion blocks are fixedly mounted on the two sides of the bottom of the bridge correspondingly, stainless steel plates are fixedly mounted at the bottoms of the two stress cushion blocks correspondingly, and the bottoms of the two stainless steel plates make contact with the tops of the two high-damping fixed plates correspondingly. According to the device for bridge jacking deviation rectification and the usage method thereof, through the arrangement of the automatic oil feeding and resistance reducing mechanism, lubricating oil can be conveniently added into the gap between the stainless steel plate and the high-damping fixed plate, then the load of the deviation rectification jack can be reduced, the whole bridge is easier to push, the service life of the deviation rectification jack is prolonged, and meanwhile the deviation rectification quality is improved.
本发明公开了一种用于桥梁顶升纠偏的装置及其使用方法,包括分配梁和设置在分配梁上方的桥梁,所述分配梁的底部固定安装有顶升千斤顶,所述分配梁顶部的两侧均固定安装有高阻尼固定板,所述桥梁底部的两侧均固定安装有受力垫块,两个所述受力垫块的底部均固定安装有不锈钢板,两个所述不锈钢板的底部分别与两个所述高阻尼固定板的顶部接触,本发明涉及构筑物顶升纠偏技术领域。该用于桥梁顶升纠偏的装置及其使用方法,通过自动上油减阻机构的设置,便于向不锈钢板与高阻尼固定板的间隙处添加润滑油,进而可减小纠偏千斤顶的负载,使得整个桥梁更加容易推动,提高纠偏千斤顶的使用寿命,同时提高纠偏质量。
Device for bridge jacking deviation rectification and usage method thereof
一种用于桥梁顶升纠偏的装置及其使用方法
ZHOU WEI (Autor:in) / SONG ZHENWANG (Autor:in) / SONG ZHENHAO (Autor:in) / JU PENGFEI (Autor:in) / TENG KUN (Autor:in) / XU DONGDONG (Autor:in)
09.11.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Building deviation rectification asynchronous jacking method
Europäisches Patentamt | 2020
|Portable sheet-shaped flexible jacking device applied to jacking deviation rectification of building
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Continuous bridge jacking device and jacking method thereof
Europäisches Patentamt | 2024
|Continuous bridge jacking device and jacking method thereof
Europäisches Patentamt | 2024
|