The invention discloses a construction method of a constructional column without formwork supporting. The construction method comprises the steps of binding a constructional column steel reinforcement cage, building two side walls, building a constructional column U-shaped plate, pouring constructional column concrete and clamping and fixing the constructional column. The construction method has the beneficial effects that tie bars are arranged, so that the bending parts of the tie bars B are clamped in gaps between bricks of the layer, the steel reinforcement cage is preliminarily and fixedly connected with the two layers of walls before pouring, and then the steel reinforcement cage can be prevented from inclining; the U-shaped plate is arranged and can be just installed in a staggered-layer-shaped gap reserved between the two side walls, then the constructional column steel reinforcement cage is wrapped and directly built on the walls, and formwork supporting pouring does not need to be carried out on the constructional column; and a clamping mechanism is arranged and can abut against a pressing plate to apply pressure to the U-shaped plate, then the poured constructional column concrete is prevented from collapsing, materials forming the clamping mechanism are convenient to obtain, meanwhile, the clamping mechanism can be repeatedly used, and the construction cost is reduced.
本发明公开了一种构造柱免支模的施工方法,包括绑扎构造柱钢筋笼、砌筑两侧墙体、砌筑构造柱U型板、浇筑构造柱混凝土、构造柱夹紧固定。本发明的有益效果是:设置有拉结钢筋,使拉结钢筋B的弯折部位卡放在该层砖块之间的缝隙处,以使钢筋笼在浇筑前与两层墙体形成初步固定连接,进而可防止钢筋笼倾斜;设置有U型板,能够正好安装在两侧墙体之间所预留的错层状间隙处,进而形成对构造柱钢筋笼的包裹,且直接砌筑在墙体上,无需对构造柱进行支模浇筑;设置有夹紧机构,能够抵住压板对U型板施加压力,进而防止所浇筑的构造柱混凝土坍塌,且构成夹紧机构的材料便于获取,同时也能够重复使用,降低施工成本。
Construction method of constructional column without formwork supporting
The invention discloses a construction method of a constructional column without formwork supporting. The construction method comprises the steps of binding a constructional column steel reinforcement cage, building two side walls, building a constructional column U-shaped plate, pouring constructional column concrete and clamping and fixing the constructional column. The construction method has the beneficial effects that tie bars are arranged, so that the bending parts of the tie bars B are clamped in gaps between bricks of the layer, the steel reinforcement cage is preliminarily and fixedly connected with the two layers of walls before pouring, and then the steel reinforcement cage can be prevented from inclining; the U-shaped plate is arranged and can be just installed in a staggered-layer-shaped gap reserved between the two side walls, then the constructional column steel reinforcement cage is wrapped and directly built on the walls, and formwork supporting pouring does not need to be carried out on the constructional column; and a clamping mechanism is arranged and can abut against a pressing plate to apply pressure to the U-shaped plate, then the poured constructional column concrete is prevented from collapsing, materials forming the clamping mechanism are convenient to obtain, meanwhile, the clamping mechanism can be repeatedly used, and the construction cost is reduced.
本发明公开了一种构造柱免支模的施工方法,包括绑扎构造柱钢筋笼、砌筑两侧墙体、砌筑构造柱U型板、浇筑构造柱混凝土、构造柱夹紧固定。本发明的有益效果是:设置有拉结钢筋,使拉结钢筋B的弯折部位卡放在该层砖块之间的缝隙处,以使钢筋笼在浇筑前与两层墙体形成初步固定连接,进而可防止钢筋笼倾斜;设置有U型板,能够正好安装在两侧墙体之间所预留的错层状间隙处,进而形成对构造柱钢筋笼的包裹,且直接砌筑在墙体上,无需对构造柱进行支模浇筑;设置有夹紧机构,能够抵住压板对U型板施加压力,进而防止所浇筑的构造柱混凝土坍塌,且构成夹紧机构的材料便于获取,同时也能够重复使用,降低施工成本。
Construction method of constructional column without formwork supporting
一种构造柱免支模的施工方法
XU HAIGUANG (Autor:in) / HU JIALIN (Autor:in) / WANG SHUO (Autor:in) / ZHAO XIN (Autor:in)
09.11.2021
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Formwork-free constructional column and construction method
Europäisches Patentamt | 2015
|Formwork-free construction method for constructional column
Europäisches Patentamt | 2024
|