Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the field of tower crane foundations, in particular to a basement tower crane foundation. The basement tower crane foundation comprises a tower crane foundation part and a tower body standard section part, wherein the tower body standard section part is connected to the tower crane foundation part, the tower crane foundation part is placed in a basement foundation pit, brick membranes are respectively connected to the side walls of the tower crane foundation part, waterproof concrete layers are arranged between the brick membranes and the tower crane foundation part, first waterproof coiled materials are connected to the sides, which face the brick membranes, of the waterproof concrete layers, second waterproof coiled materials are connected to the sides, which face the tower crane foundation, of the waterproof concrete layers, and a third waterproof coiled material is connected to the bottom surface of the tower crane foundation part. The basement tower crane foundation has the effect of reducing potential safety hazards.
本申请涉及塔吊基础的领域,尤其是涉及一种地下室塔吊基础,其包括塔吊基础部、连接于塔吊基础部的塔身标准节部,所述塔吊基础部用于放置在地下室基坑内,所述塔吊基础部的侧壁上均连接有砖胎膜,所述砖胎膜和塔吊基础部之间设有防水砼层,所述防水砼层朝向砖胎膜的一侧连接有第一防水卷材,所述防水砼层朝向塔吊基础的一侧连接有第二防水卷材,所述塔吊基础部的底面连接有第三防水卷材。本申请具有降低安全隐患的效果。
The invention relates to the field of tower crane foundations, in particular to a basement tower crane foundation. The basement tower crane foundation comprises a tower crane foundation part and a tower body standard section part, wherein the tower body standard section part is connected to the tower crane foundation part, the tower crane foundation part is placed in a basement foundation pit, brick membranes are respectively connected to the side walls of the tower crane foundation part, waterproof concrete layers are arranged between the brick membranes and the tower crane foundation part, first waterproof coiled materials are connected to the sides, which face the brick membranes, of the waterproof concrete layers, second waterproof coiled materials are connected to the sides, which face the tower crane foundation, of the waterproof concrete layers, and a third waterproof coiled material is connected to the bottom surface of the tower crane foundation part. The basement tower crane foundation has the effect of reducing potential safety hazards.
本申请涉及塔吊基础的领域,尤其是涉及一种地下室塔吊基础,其包括塔吊基础部、连接于塔吊基础部的塔身标准节部,所述塔吊基础部用于放置在地下室基坑内,所述塔吊基础部的侧壁上均连接有砖胎膜,所述砖胎膜和塔吊基础部之间设有防水砼层,所述防水砼层朝向砖胎膜的一侧连接有第一防水卷材,所述防水砼层朝向塔吊基础的一侧连接有第二防水卷材,所述塔吊基础部的底面连接有第三防水卷材。本申请具有降低安全隐患的效果。
Construction method for basement tower crane foundation
Europäisches Patentamt | 2020
|Construction method for basement raft foundation with tower crane foundation
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2023
|Construction method of piled raft basement tower crane foundation structure
Europäisches Patentamt | 2024
|