Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for drilling sewage pipeline through slewing drilling machine
The invention relates to a construction method for drilling a sewage pipeline through a slewing drilling machine, and belongs to the technical field of sewage pipeline foundation construction. The method comprises the following steps of pressing a pipe body to the sewage pipeline to block the sewage pipeline; establishing a visual first virtual model based on information of the sewage pipeline; establishing a visual second virtual model based on attitude information of a pipe body; combining the first virtual model and the second virtual model into a visual construction model, and adjusting the movement track of the pipe body based on the visual construction model. The visual construction model is established through a terminal server and a calibration device additionally arranged on the slewing drilling machine, so that the posture of the pipe body is adjusted, and the pipe body can thoroughly block the sewage pipeline. According to the method for blocking the sewage pipeline through the pipe body, the personnel safety is guaranteed, and the construction efficiency is improved.
本发明涉及一种回转钻机钻穿污水管线的施工方法,属于污水管线基础施工技术领域。其中方法为:下压管体至污水管线位置以封堵污水管线;基于污水管线的信息建立可视化第一虚拟模型;基于管体的姿态信息建立可视化第二虚拟模型;将所述第一虚拟模型和第二虚拟模型合并为可视化施工模型,并且基于所述可视化施工模型调整所述管体的运动轨迹。通过终端服务器和加装在回转钻机上的校准装置建立可视化施工模型,从而调整管体的姿态,使得管体能够彻底封堵住污水管线。本发明采用管体封堵污水管线的方法,保证了人员安全,提高了施工效率。
Construction method for drilling sewage pipeline through slewing drilling machine
The invention relates to a construction method for drilling a sewage pipeline through a slewing drilling machine, and belongs to the technical field of sewage pipeline foundation construction. The method comprises the following steps of pressing a pipe body to the sewage pipeline to block the sewage pipeline; establishing a visual first virtual model based on information of the sewage pipeline; establishing a visual second virtual model based on attitude information of a pipe body; combining the first virtual model and the second virtual model into a visual construction model, and adjusting the movement track of the pipe body based on the visual construction model. The visual construction model is established through a terminal server and a calibration device additionally arranged on the slewing drilling machine, so that the posture of the pipe body is adjusted, and the pipe body can thoroughly block the sewage pipeline. According to the method for blocking the sewage pipeline through the pipe body, the personnel safety is guaranteed, and the construction efficiency is improved.
本发明涉及一种回转钻机钻穿污水管线的施工方法,属于污水管线基础施工技术领域。其中方法为:下压管体至污水管线位置以封堵污水管线;基于污水管线的信息建立可视化第一虚拟模型;基于管体的姿态信息建立可视化第二虚拟模型;将所述第一虚拟模型和第二虚拟模型合并为可视化施工模型,并且基于所述可视化施工模型调整所述管体的运动轨迹。通过终端服务器和加装在回转钻机上的校准装置建立可视化施工模型,从而调整管体的姿态,使得管体能够彻底封堵住污水管线。本发明采用管体封堵污水管线的方法,保证了人员安全,提高了施工效率。
Construction method for drilling sewage pipeline through slewing drilling machine
一种回转钻机钻穿污水管线的施工方法
CHEN ZHENYI (Autor:in) / LI ZHENG (Autor:in) / LI YAWEI (Autor:in) / XU MIAOXIN (Autor:in)
16.11.2021
Patent
Elektronische Ressource
Chinesisch
Construction method for pipe-following drilling micro pile of slewing drilling machine
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2023
|Pile pulling construction method of hydraulic full-sleeve full-slewing drilling machine
Europäisches Patentamt | 2024
|Full-casing full-slewing drilling machine hole-forming process
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|