Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated concrete double-layer gate-type pier structure and construction method
The invention discloses a fabricated concrete double-layer gate-type pier structure and a construction method. The double-layer gate-type pier structure comprises a pier column foundation, a lower stand column, a lower cover beam, a left stand column, a right stand column and an upper cover beam, wherein the pier column foundation is provided with a pre-embedded outwards-extending connecting steel bar; a grouting sleeve is arranged at a lower end of the lower stand column, and a pre-buried outwards-extending connecting steel bar is arranged at an upper end of the lower stand column; the left side and the right side of an upper end of the lower cover beam are provided with pre-embedded outwards-extending connecting steel bars; grouting sleeves are arranged at lower ends of the left stand column and the right stand column, and pre-buried outwards-extending connecting steel bars are arranged at upper ends of the left stand column and the right stand column; grouting sleeves are arranged on the left side and the right side of a lower end of the upper cover beam; the pier column foundation and the lower stand column, the lower stand column and the lower cover beam, the lower cover beam and the left stand column and the right stand column, and the left stand column, the right stand column and the upper cover beam are connected through grouting sleeves. The structure is reliable in performance and easy to operate, and the construction speed and quality of the fabricated gate-type pier can be guaranteed.
本发明公开了一种装配式混凝土双层门式墩结构及施工方法,该双层门式墩结构包括:墩柱基础、下立柱、下盖梁、左立柱、右立柱、上盖梁;所述墩柱基础上设有预埋的外伸连接钢筋;所述下立柱下端设置有灌浆套筒,其上端设有预埋的外伸连接钢筋;所述下盖梁下端设置有灌浆套筒,其上端左侧、上端右侧设有预埋的外伸连接钢筋;所述左立柱和右立柱下端均设置有灌浆套筒,左立柱和右立柱上端设有预埋的外伸连接钢筋;所述上盖梁下端左侧和下端右侧设置灌浆套筒;所述墩柱基础与下立柱、下立柱与下盖梁、下盖梁与左立柱和右立柱、左立柱和右立柱和上盖梁均通过灌浆套筒连接。本发明性能可靠,操作简单,可以保证装配式门式墩施工速度和质量。
Fabricated concrete double-layer gate-type pier structure and construction method
The invention discloses a fabricated concrete double-layer gate-type pier structure and a construction method. The double-layer gate-type pier structure comprises a pier column foundation, a lower stand column, a lower cover beam, a left stand column, a right stand column and an upper cover beam, wherein the pier column foundation is provided with a pre-embedded outwards-extending connecting steel bar; a grouting sleeve is arranged at a lower end of the lower stand column, and a pre-buried outwards-extending connecting steel bar is arranged at an upper end of the lower stand column; the left side and the right side of an upper end of the lower cover beam are provided with pre-embedded outwards-extending connecting steel bars; grouting sleeves are arranged at lower ends of the left stand column and the right stand column, and pre-buried outwards-extending connecting steel bars are arranged at upper ends of the left stand column and the right stand column; grouting sleeves are arranged on the left side and the right side of a lower end of the upper cover beam; the pier column foundation and the lower stand column, the lower stand column and the lower cover beam, the lower cover beam and the left stand column and the right stand column, and the left stand column, the right stand column and the upper cover beam are connected through grouting sleeves. The structure is reliable in performance and easy to operate, and the construction speed and quality of the fabricated gate-type pier can be guaranteed.
本发明公开了一种装配式混凝土双层门式墩结构及施工方法,该双层门式墩结构包括:墩柱基础、下立柱、下盖梁、左立柱、右立柱、上盖梁;所述墩柱基础上设有预埋的外伸连接钢筋;所述下立柱下端设置有灌浆套筒,其上端设有预埋的外伸连接钢筋;所述下盖梁下端设置有灌浆套筒,其上端左侧、上端右侧设有预埋的外伸连接钢筋;所述左立柱和右立柱下端均设置有灌浆套筒,左立柱和右立柱上端设有预埋的外伸连接钢筋;所述上盖梁下端左侧和下端右侧设置灌浆套筒;所述墩柱基础与下立柱、下立柱与下盖梁、下盖梁与左立柱和右立柱、左立柱和右立柱和上盖梁均通过灌浆套筒连接。本发明性能可靠,操作简单,可以保证装配式门式墩施工速度和质量。
Fabricated concrete double-layer gate-type pier structure and construction method
一种装配式混凝土双层门式墩结构及施工方法
KANG JUNTAO (Autor:in) / YANG GUOLIN (Autor:in)
19.11.2021
Patent
Elektronische Ressource
Chinesisch
Fabricated concrete-filled steel tube double-layer gate-type pier structure
Europäisches Patentamt | 2021
|Fabricated concrete pier bearing platform structure and pier construction method
Europäisches Patentamt | 2024
|Ultra-high performance concrete gate-type pier structure and construction method
Europäisches Patentamt | 2022
|Fabricated concrete pier connecting structure and construction method thereof
Europäisches Patentamt | 2022
|Concrete sluice gate pier structure and construction method thereof
Europäisches Patentamt | 2021
|