Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to a piling device, and particularly relates to a piling device for municipal engineering. The piling device for municipal engineering is relatively simple in operation step, relatively high in piling stability and relatively high in piling efficiency. The piling device for municipal engineering comprises a bottom plate, a first sliding rail, a pressing block and first springs; the bottom plate is provided with the first sliding rail; the pressing block is arranged on the first sliding rail in a sliding manner; the three first springs are evenly wound around the first sliding rail; the two ends of each first spring are connected with the first sliding rail and the pressing block correspondingly; the bottom plate is provided with a drive mechanism; the first sliding rail and the pressing block are connected with the drive mechanism; and the bottom plate is provided with a fixing mechanism. According to the piling device for municipal engineering, the drive mechanism and the fixing mechanism are arranged, the fixing mechanism can fix the device, the inclination phenomenon during piling is avoided, the piling stability is improved, the drive mechanism can achieve the automatic and precise piling effect, and time and labor are saved.
本发明涉及一种打桩装置,尤其涉及一种市政工程用打桩装置。本发明提供一种操作步骤相对简单、打桩稳定性相对较高和打桩效率相对高效的市政工程用打桩装置。一种市政工程用打桩装置,包括有底板、第一滑轨、压块和第一弹簧,底板上设有第一滑轨,第一滑轨上滑动式设有压块,第一滑轨上均匀绕有三根第一弹簧,第一弹簧两端分别与第一滑轨和压块连接,底板上设有驱动机构,第一滑轨和压块均与驱动机构连接,底板上设有固定机构。本发明通过设有驱动机构和固定机构,固定机构可对本装置进行固定,避免打桩时发生倾斜现象,提高打桩的稳定性,驱动机构可实现自动精准打桩效果,省时省力。
The invention relates to a piling device, and particularly relates to a piling device for municipal engineering. The piling device for municipal engineering is relatively simple in operation step, relatively high in piling stability and relatively high in piling efficiency. The piling device for municipal engineering comprises a bottom plate, a first sliding rail, a pressing block and first springs; the bottom plate is provided with the first sliding rail; the pressing block is arranged on the first sliding rail in a sliding manner; the three first springs are evenly wound around the first sliding rail; the two ends of each first spring are connected with the first sliding rail and the pressing block correspondingly; the bottom plate is provided with a drive mechanism; the first sliding rail and the pressing block are connected with the drive mechanism; and the bottom plate is provided with a fixing mechanism. According to the piling device for municipal engineering, the drive mechanism and the fixing mechanism are arranged, the fixing mechanism can fix the device, the inclination phenomenon during piling is avoided, the piling stability is improved, the drive mechanism can achieve the automatic and precise piling effect, and time and labor are saved.
本发明涉及一种打桩装置,尤其涉及一种市政工程用打桩装置。本发明提供一种操作步骤相对简单、打桩稳定性相对较高和打桩效率相对高效的市政工程用打桩装置。一种市政工程用打桩装置,包括有底板、第一滑轨、压块和第一弹簧,底板上设有第一滑轨,第一滑轨上滑动式设有压块,第一滑轨上均匀绕有三根第一弹簧,第一弹簧两端分别与第一滑轨和压块连接,底板上设有驱动机构,第一滑轨和压块均与驱动机构连接,底板上设有固定机构。本发明通过设有驱动机构和固定机构,固定机构可对本装置进行固定,避免打桩时发生倾斜现象,提高打桩的稳定性,驱动机构可实现自动精准打桩效果,省时省力。