Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction design method of double-curved-surface curtain wall
The invention discloses a construction design method of a double-curved-surface curtain wall. The method comprises the steps of field environment acceptance processing, computer simulation design positioning, surveying and setting out, mounting hole inspection, embedded part cleaning and positioning, curtain wall frame mounting, stress testing piece placing at a plurality of nodes of the curtain wall frame, stress value collecting at each node, finite element analysis, hyperbolic curtain wall segmentation, vertical keel mounting, and curtain wall frame installation. Cross beam installation, curtain wall installation and structural adhesive injection operation, sealant sealing operation, curtain wall surface cleaning and completion acceptance. According to the construction design method of the hyperbolic curtain wall, the stress test pieces are placed at the multiple nodes of the curtain wall frame, the stress values of the nodes are collected, finite element analysis is conducted, and the hyperbolic curtain wall is segmented, so that the whole weak part of the curtain wall can be effectively solved, and then reinforcement is conducted in the later period; and higher safety and reliability are realized.
本发明公开了一种双曲面幕墙的构造设计方法,其特征在于,所述方法包括:现场环境验收处理、计算机模拟设计定位、测量放线、安装洞口检查、预埋件清理及其定位、幕墙框安装、于幕墙框多个节点处放置应力测试片、收集各个节点处的应力数值、进行有限元分析、对双曲幕墙进行分割、竖向龙骨安装、横梁安装、幕墙安装及其注结构胶操作、密封胶封闭操作、幕墙表面清洁和竣工验收。本发明提供的一种双曲面幕墙的构造设计方法通过于幕墙框多个节点处放置应力测试片、收集各个节点处的应力数值、进行有限元分析和对双曲幕墙进行分割的操作,能够有效解算出幕墙的整体薄弱部分,进而后期进行加固,更加的安全可靠。
Construction design method of double-curved-surface curtain wall
The invention discloses a construction design method of a double-curved-surface curtain wall. The method comprises the steps of field environment acceptance processing, computer simulation design positioning, surveying and setting out, mounting hole inspection, embedded part cleaning and positioning, curtain wall frame mounting, stress testing piece placing at a plurality of nodes of the curtain wall frame, stress value collecting at each node, finite element analysis, hyperbolic curtain wall segmentation, vertical keel mounting, and curtain wall frame installation. Cross beam installation, curtain wall installation and structural adhesive injection operation, sealant sealing operation, curtain wall surface cleaning and completion acceptance. According to the construction design method of the hyperbolic curtain wall, the stress test pieces are placed at the multiple nodes of the curtain wall frame, the stress values of the nodes are collected, finite element analysis is conducted, and the hyperbolic curtain wall is segmented, so that the whole weak part of the curtain wall can be effectively solved, and then reinforcement is conducted in the later period; and higher safety and reliability are realized.
本发明公开了一种双曲面幕墙的构造设计方法,其特征在于,所述方法包括:现场环境验收处理、计算机模拟设计定位、测量放线、安装洞口检查、预埋件清理及其定位、幕墙框安装、于幕墙框多个节点处放置应力测试片、收集各个节点处的应力数值、进行有限元分析、对双曲幕墙进行分割、竖向龙骨安装、横梁安装、幕墙安装及其注结构胶操作、密封胶封闭操作、幕墙表面清洁和竣工验收。本发明提供的一种双曲面幕墙的构造设计方法通过于幕墙框多个节点处放置应力测试片、收集各个节点处的应力数值、进行有限元分析和对双曲幕墙进行分割的操作,能够有效解算出幕墙的整体薄弱部分,进而后期进行加固,更加的安全可靠。
Construction design method of double-curved-surface curtain wall
一种双曲面幕墙的构造设计方法
LIAO ZHIBIN (Autor:in) / HUANG YU (Autor:in)
23.11.2021
Patent
Elektronische Ressource
Chinesisch
Special-shaped double-curved-surface curtain wall keel construction method
Europäisches Patentamt | 2023
|Curved surface curtain wall installation construction method
Europäisches Patentamt | 2023
|Double-curved-surface glass curtain wall point connection type construction method
Europäisches Patentamt | 2023
|Large double-curved-surface GRC curtain wall structure and construction method
Europäisches Patentamt | 2024
|Double-curved-surface torsion glass curtain wall and construction method thereof
Europäisches Patentamt | 2023
|