Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated part grouting layer plugging method and fabricated part connection construction method
The invention relates to a fabricated part grouting layer plugging method and a fabricated part connection construction method. The fabricated part grouting layer plugging method comprises the following steps that after a binding wire bypasses a pre-embedded steel bar of a lower part, the two end parts of the binding wire penetrate through a plugging piece which is placed on the outer side of the grouting layer between an upper part and a lower part in advance, and the bottom surface of the plugging piece is in contact with the lower part; and the two parts, penetrating through the two parts of the plugging piece, of the binding wire are bound, the plugging piece is pressed on the side face of the upper part which is hoisted in advance through wire joints formed after binding, the grouting layer is plugged through the plugging piece. The fabricated part grouting layer plugging method is high in construction speed, and the engineering quality is guaranteed.
本发明涉及装配式构件灌浆层封堵方法及装配式构件连接施工方法,包括以下步骤:绑线绕过下部构件预埋的钢筋后,将绑线的两个端部穿过预先放置在上部构件和下部构件之间灌浆层外侧的封堵件,封堵件的底面与下部构件接触;将绑线穿过封堵件的两个部分捆扎,并利用捆扎后形成的线节将封堵件压在预先吊装好的上部构件的侧面,利用封堵件对灌浆层进行封堵,本发明的封堵方法施工速度快,保证了工程质量。
Fabricated part grouting layer plugging method and fabricated part connection construction method
The invention relates to a fabricated part grouting layer plugging method and a fabricated part connection construction method. The fabricated part grouting layer plugging method comprises the following steps that after a binding wire bypasses a pre-embedded steel bar of a lower part, the two end parts of the binding wire penetrate through a plugging piece which is placed on the outer side of the grouting layer between an upper part and a lower part in advance, and the bottom surface of the plugging piece is in contact with the lower part; and the two parts, penetrating through the two parts of the plugging piece, of the binding wire are bound, the plugging piece is pressed on the side face of the upper part which is hoisted in advance through wire joints formed after binding, the grouting layer is plugged through the plugging piece. The fabricated part grouting layer plugging method is high in construction speed, and the engineering quality is guaranteed.
本发明涉及装配式构件灌浆层封堵方法及装配式构件连接施工方法,包括以下步骤:绑线绕过下部构件预埋的钢筋后,将绑线的两个端部穿过预先放置在上部构件和下部构件之间灌浆层外侧的封堵件,封堵件的底面与下部构件接触;将绑线穿过封堵件的两个部分捆扎,并利用捆扎后形成的线节将封堵件压在预先吊装好的上部构件的侧面,利用封堵件对灌浆层进行封堵,本发明的封堵方法施工速度快,保证了工程质量。
Fabricated part grouting layer plugging method and fabricated part connection construction method
装配式构件灌浆层封堵方法及装配式构件连接施工方法
LI XIAOPENG (Autor:in) / CUI LONG (Autor:in) / SONG SHUANGYANG (Autor:in) / CUI SHIQI (Autor:in) / SUN JIANDONG (Autor:in) / LOU XIN (Autor:in)
26.11.2021
Patent
Elektronische Ressource
Chinesisch
Fabricated concrete grouting connection stair and construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2020
|Fabricated building grouting material and construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|