Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Safety protection board room for building construction
The invention discloses a safety protection board room for building construction, and relates to the field of house construction. The safety protection board room comprises a bottom plate installed on the ground, a plurality of wallboards installed on the bottom plate and a top plate installed at the upper ends of the wallboards, and a protection ring is connected with the outer side wall, adjacent to the ground, of the bottom plate in the circumferential direction; a protection groove is formed in the upper end face of the protection ring in the circumferential direction, a waterproof sleeve is connected to the bottom wall of the protection groove in the circumferential direction, the waterproof sleeve is stored and stacked in the protection groove, and a buoyancy ring is connected to the upper end of the waterproof sleeve in the circumferential direction; and a plurality of limiting pieces are arranged between the buoyancy ring and the upper end face of the protection ring at intervals in the circumferential direction, and the buoyancy ring is detachably connected with the protection ring through the limiting pieces. When heavy rainfall weather occurs, the limiting pieces are removed firstly, the buoyancy ring can rise along with the water level along with the rise of the water level on the ground, so that the waterproof sleeve is pulled out of the protection groove and surrounds the wallboards, sewage entering the board room is reduced, and the living safety of workers is guaranteed.
本申请公开了一种建筑施工用安全防护板房,涉及房屋建筑的领域,包括安装于地面上的底板、若干个安装于底板上的墙板以及安装于墙板上端的顶板,所述底板相邻地面的外侧壁沿周向连接有防护环,所述防护环的上端面沿周向开设有防护槽,所述防护槽的底壁上沿周向连接有防水套,所述防水套收纳叠放于防护槽内,所述防水套的上端沿周向连接有浮力环,所述浮力环与防护环上端面之间沿周向间隔设置有若干个限位件,所述浮力环通过限位件与防护环可拆卸连接。当发生强降雨天气时,先解除限位件,随着地面的水位上升,浮力环能够随水位上升,从而将防水套将防护槽内拉出,防水套将墙板环绕,进而减少污水进入活动板房内,保障工人的居住安全。
Safety protection board room for building construction
The invention discloses a safety protection board room for building construction, and relates to the field of house construction. The safety protection board room comprises a bottom plate installed on the ground, a plurality of wallboards installed on the bottom plate and a top plate installed at the upper ends of the wallboards, and a protection ring is connected with the outer side wall, adjacent to the ground, of the bottom plate in the circumferential direction; a protection groove is formed in the upper end face of the protection ring in the circumferential direction, a waterproof sleeve is connected to the bottom wall of the protection groove in the circumferential direction, the waterproof sleeve is stored and stacked in the protection groove, and a buoyancy ring is connected to the upper end of the waterproof sleeve in the circumferential direction; and a plurality of limiting pieces are arranged between the buoyancy ring and the upper end face of the protection ring at intervals in the circumferential direction, and the buoyancy ring is detachably connected with the protection ring through the limiting pieces. When heavy rainfall weather occurs, the limiting pieces are removed firstly, the buoyancy ring can rise along with the water level along with the rise of the water level on the ground, so that the waterproof sleeve is pulled out of the protection groove and surrounds the wallboards, sewage entering the board room is reduced, and the living safety of workers is guaranteed.
本申请公开了一种建筑施工用安全防护板房,涉及房屋建筑的领域,包括安装于地面上的底板、若干个安装于底板上的墙板以及安装于墙板上端的顶板,所述底板相邻地面的外侧壁沿周向连接有防护环,所述防护环的上端面沿周向开设有防护槽,所述防护槽的底壁上沿周向连接有防水套,所述防水套收纳叠放于防护槽内,所述防水套的上端沿周向连接有浮力环,所述浮力环与防护环上端面之间沿周向间隔设置有若干个限位件,所述浮力环通过限位件与防护环可拆卸连接。当发生强降雨天气时,先解除限位件,随着地面的水位上升,浮力环能够随水位上升,从而将防水套将防护槽内拉出,防水套将墙板环绕,进而减少污水进入活动板房内,保障工人的居住安全。
Safety protection board room for building construction
一种建筑施工用安全防护板房
WU CHENGFENG (Autor:in) / JIN JIANQIANG (Autor:in)
26.11.2021
Patent
Elektronische Ressource
Chinesisch