Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Intelligent monitoring method for construction of roller compacted concrete on dam
The invention discloses an intelligent monitoring method for construction of roller compacted concrete on a dam, belonging to the technical field of intelligent construction. The intelligent monitoring method for construction of the roller compacted concrete on the dam comprises the following steps: A1, intelligent monitoring of roller compaction quality of the concrete, wherein the state of construction equipment and construction data are monitored in real time, a prediction model is established, and pre-warning and alarming are set; and A2, intelligent control of concrete temperature, wherein real-time acquisition, sharing, analysis, control and feedback of temperature control data of the concrete in the periods of raw material acquisition, mixing, bin surface control and internal life cycle are conducted so as to realize full-link intelligent control over raw material precooling, concrete mixing, transportation, warehousing, spreading, vibration, maintenance and water cooling. According to the method, informatization, digitization and intelligentization of construction of the roller compacted concrete on the dam are achieved, efficient construction quality control and automatic temperature control are achieved, the whole construction process is intelligentized, and construction progress and quality are guaranteed.
本发明公开了一种大坝碾压混凝土施工智能化监控方法,属于智能化施工技术领域。一种大坝碾压混凝土施工智能化监控方法,包括A1,混凝土碾压质量智能监控:对施工设备状态、施工数据进行实时监控,建立预测模型,设置预、报警;A2,混凝土温度智能控制:对混凝土自原材料、拌合、仓面控制、内部生命周期内的温控数据实时采集、共享、分析、控制及反馈,实现原材料预冷、混凝土拌合、运输、入仓、平仓、振捣、养护、通水冷却的全环节智能控制。本发明,实现了大坝碾压混凝土施工的信息化、数字化、智能化,及高效的施工质量控制和自动化温控,使得整个施工过程智能化,保证施工进度及质量。
Intelligent monitoring method for construction of roller compacted concrete on dam
The invention discloses an intelligent monitoring method for construction of roller compacted concrete on a dam, belonging to the technical field of intelligent construction. The intelligent monitoring method for construction of the roller compacted concrete on the dam comprises the following steps: A1, intelligent monitoring of roller compaction quality of the concrete, wherein the state of construction equipment and construction data are monitored in real time, a prediction model is established, and pre-warning and alarming are set; and A2, intelligent control of concrete temperature, wherein real-time acquisition, sharing, analysis, control and feedback of temperature control data of the concrete in the periods of raw material acquisition, mixing, bin surface control and internal life cycle are conducted so as to realize full-link intelligent control over raw material precooling, concrete mixing, transportation, warehousing, spreading, vibration, maintenance and water cooling. According to the method, informatization, digitization and intelligentization of construction of the roller compacted concrete on the dam are achieved, efficient construction quality control and automatic temperature control are achieved, the whole construction process is intelligentized, and construction progress and quality are guaranteed.
本发明公开了一种大坝碾压混凝土施工智能化监控方法,属于智能化施工技术领域。一种大坝碾压混凝土施工智能化监控方法,包括A1,混凝土碾压质量智能监控:对施工设备状态、施工数据进行实时监控,建立预测模型,设置预、报警;A2,混凝土温度智能控制:对混凝土自原材料、拌合、仓面控制、内部生命周期内的温控数据实时采集、共享、分析、控制及反馈,实现原材料预冷、混凝土拌合、运输、入仓、平仓、振捣、养护、通水冷却的全环节智能控制。本发明,实现了大坝碾压混凝土施工的信息化、数字化、智能化,及高效的施工质量控制和自动化温控,使得整个施工过程智能化,保证施工进度及质量。
Intelligent monitoring method for construction of roller compacted concrete on dam
一种大坝碾压混凝土施工智能化监控方法
WANG TAO (Autor:in) / ZHAO XIYUN (Autor:in) / ZHU FEI (Autor:in) / LI FEI (Autor:in) / YUE WEI (Autor:in)
26.11.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
G01K
MEASURING TEMPERATURE
,
Messen der Temperatur
/
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
E02D
FOUNDATIONS
,
Gründungen
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
Intelligent roller compacted concrete equipment and construction method thereof
Europäisches Patentamt | 2024
|ROLLER COMPACTED CONCRETE MATERIAL MIXING METHOD AND ROLLER COMPACTED CONCRETE
Europäisches Patentamt | 2021
|Roller-compacted concrete pavements and concrete construction
UB Braunschweig | 1986
|Dam roller compacted concrete rollover construction method
Europäisches Patentamt | 2023
|