Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Auxiliary piling device for bridge tubular pile
The invention relates to the field of buildings, in particular to an auxiliary piling device for a bridge tubular pile. The auxiliary piling device comprises a supporting piece, a tubular pile, a piling block and a mounting frame and further comprises a connecting assembly, a protective sleeve, a driving assembly, an adjusting assembly and a measuring assembly, the connecting assembly is connected with the piling block, the protective sleeve is connected with the tubular pile, the driving assembly is mounted on the mounting frame, one end of the adjusting assembly is connected with the driving assembly, and the other end of the adjusting assembly is connected with the connecting assembly; the measuring assembly is mounted on the mounting frame; and in the piling process, the driving assembly drives the adjusting assembly to drive the piling block connected with the connecting assembly to make intermittent contact with the protective sleeve installed on the tubular pile, so that piling on the tubular pile is achieved, the driving assembly can also drive a dust removing assembly to carry out dust falling treatment on generated dust while piling is carried out, and after piling is finished, the driving assembly drives the adjusting assembly to drive the piling block connected with the connecting assembly to be away from the protective sleeve.
本发明涉及建筑领域,具体是一种桥梁管桩辅助打桩装置,包括有支撑件、管桩、打桩块和安装框,还包括有连接组件、保护套、驱动组件、调节组件以及测量组件所述连接组件与打桩块连接,所述保护套与管桩连接,所述驱动组件安装在安装框上所述调节组件一端与驱动组件连接,另一端与连接组件连接;所述测量组件安装在安装框上;在进行打桩时,通过驱动组件驱动调节组件带动与连接组件连接的打桩块间歇性的与安装在管桩上的保护套接触,以此实现对管桩进行打桩,在进行打桩的同时,驱动组件也会驱动清尘组件对产生的灰尘进行降尘处理,打桩结束后,驱动组件通过驱动调节组件带动与连接组件连接的打桩块远离保护套。
Auxiliary piling device for bridge tubular pile
The invention relates to the field of buildings, in particular to an auxiliary piling device for a bridge tubular pile. The auxiliary piling device comprises a supporting piece, a tubular pile, a piling block and a mounting frame and further comprises a connecting assembly, a protective sleeve, a driving assembly, an adjusting assembly and a measuring assembly, the connecting assembly is connected with the piling block, the protective sleeve is connected with the tubular pile, the driving assembly is mounted on the mounting frame, one end of the adjusting assembly is connected with the driving assembly, and the other end of the adjusting assembly is connected with the connecting assembly; the measuring assembly is mounted on the mounting frame; and in the piling process, the driving assembly drives the adjusting assembly to drive the piling block connected with the connecting assembly to make intermittent contact with the protective sleeve installed on the tubular pile, so that piling on the tubular pile is achieved, the driving assembly can also drive a dust removing assembly to carry out dust falling treatment on generated dust while piling is carried out, and after piling is finished, the driving assembly drives the adjusting assembly to drive the piling block connected with the connecting assembly to be away from the protective sleeve.
本发明涉及建筑领域,具体是一种桥梁管桩辅助打桩装置,包括有支撑件、管桩、打桩块和安装框,还包括有连接组件、保护套、驱动组件、调节组件以及测量组件所述连接组件与打桩块连接,所述保护套与管桩连接,所述驱动组件安装在安装框上所述调节组件一端与驱动组件连接,另一端与连接组件连接;所述测量组件安装在安装框上;在进行打桩时,通过驱动组件驱动调节组件带动与连接组件连接的打桩块间歇性的与安装在管桩上的保护套接触,以此实现对管桩进行打桩,在进行打桩的同时,驱动组件也会驱动清尘组件对产生的灰尘进行降尘处理,打桩结束后,驱动组件通过驱动调节组件带动与连接组件连接的打桩块远离保护套。
Auxiliary piling device for bridge tubular pile
一种桥梁管桩辅助打桩装置
YUAN CHENGBIN (Autor:in) / ZU XIANWEI (Autor:in) / LYU WEIQIAN (Autor:in) / QIN BO (Autor:in) / LI YUYAO (Autor:in) / LU XINYAN (Autor:in) / CHEN CHANGYOU (Autor:in) / YANG BINXIAN (Autor:in) / LI ZHONGJUN (Autor:in) / XU ZE (Autor:in)
30.11.2021
Patent
Elektronische Ressource
Chinesisch
Piling stress processing mechanism based on tubular pile
Europäisches Patentamt | 2021
|Pile body auxiliary mechanical arm for photovoltaic piling
Europäisches Patentamt | 2023
|Tubular pile capable of reducing vibration and matched piling device
Europäisches Patentamt | 2023
|Sheet piling and reinforced concrete tubular piling
Engineering Index Backfile | 1921
|