Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Novel inspection well ring beam formwork supporting device and construction method
The invention belongs to the technical field of municipal engineering, and relates to an inspection well on a road, in particular to a novel well chamber concrete ring beam formwork supporting device and a construction method. The novel well chamber concrete ring beam formwork supporting device is characterized in that the novel well chamber concrete ring beam formwork supporting device comprises a ring beam side formwork and at least one movable supporting assembly, and the at least one movable supporting assembly is connected with the ring beam side formwork; the movable supporting assembly comprises a first pipeline, a second pipeline and a plurality of fasteners, the first pipeline and the second pipeline are connected through the fasteners, and the cross length of the second pipeline and the first pipeline can be controlled by adjusting the fasteners. The novel well chamber concrete ring beam formwork supporting device and the construction method has the beneficial effects that by arranging the adjustable movable supporting assembly, the novel well chamber concrete ring beam formwork supporting device can be suitable for ring beam construction of inspection wells of different positions and different sizes, and is more flexible, more convenient, capable of being recycled, economical and environmentally friendly. In addition, the novel well chamber concrete ring beam formwork supporting device is very convenient to mount and dismount, firm, reliable, simple to operate and convenient to construct and maintain in the later period.
本发明属于市政工程技术领域,涉及道路上检查井,尤其涉及一种新型井室混凝土环梁模板支撑装置及施工方法,其特征在于:包括环梁侧模和至少一个活动支撑组件,所述至少一个活动支撑组件均与所述环梁侧模连接;所述活动支撑组件包括第一管道、第二管道和多个紧固件,所述第一管道与所述第二管道通过所述紧固件连接,通过调节所述紧固件可控制所述第二管道与所述第一管道交叉的长度。本发明的有益之处在于:通过设置可调式的活动支撑组件,能够适用不同位置、不同尺寸的检查井的环梁施工,更加灵活、便捷,且可循环使用,经济环保。另外,该装置的安装和拆除都非常方便,牢固可靠且操作简单,便于施工和后期的维护。
Novel inspection well ring beam formwork supporting device and construction method
The invention belongs to the technical field of municipal engineering, and relates to an inspection well on a road, in particular to a novel well chamber concrete ring beam formwork supporting device and a construction method. The novel well chamber concrete ring beam formwork supporting device is characterized in that the novel well chamber concrete ring beam formwork supporting device comprises a ring beam side formwork and at least one movable supporting assembly, and the at least one movable supporting assembly is connected with the ring beam side formwork; the movable supporting assembly comprises a first pipeline, a second pipeline and a plurality of fasteners, the first pipeline and the second pipeline are connected through the fasteners, and the cross length of the second pipeline and the first pipeline can be controlled by adjusting the fasteners. The novel well chamber concrete ring beam formwork supporting device and the construction method has the beneficial effects that by arranging the adjustable movable supporting assembly, the novel well chamber concrete ring beam formwork supporting device can be suitable for ring beam construction of inspection wells of different positions and different sizes, and is more flexible, more convenient, capable of being recycled, economical and environmentally friendly. In addition, the novel well chamber concrete ring beam formwork supporting device is very convenient to mount and dismount, firm, reliable, simple to operate and convenient to construct and maintain in the later period.
本发明属于市政工程技术领域,涉及道路上检查井,尤其涉及一种新型井室混凝土环梁模板支撑装置及施工方法,其特征在于:包括环梁侧模和至少一个活动支撑组件,所述至少一个活动支撑组件均与所述环梁侧模连接;所述活动支撑组件包括第一管道、第二管道和多个紧固件,所述第一管道与所述第二管道通过所述紧固件连接,通过调节所述紧固件可控制所述第二管道与所述第一管道交叉的长度。本发明的有益之处在于:通过设置可调式的活动支撑组件,能够适用不同位置、不同尺寸的检查井的环梁施工,更加灵活、便捷,且可循环使用,经济环保。另外,该装置的安装和拆除都非常方便,牢固可靠且操作简单,便于施工和后期的维护。
Novel inspection well ring beam formwork supporting device and construction method
一种新型检查井环梁模板支撑装置及施工方法
SHI ZHOUYANG (Autor:in) / HUANG ZHANCHENG (Autor:in) / SHAO HUAIZHEN (Autor:in) / BAI YUNPENG (Autor:in) / SUN HAO (Autor:in)
30.11.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Concrete inspection well formwork device and construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Construction method of circular inspection well formwork
Europäisches Patentamt | 2021
|Novel formwork supporting system and construction method
Europäisches Patentamt | 2024
|