Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Scaffold lifting operation system and method
The invention provides a scaffold lifting operation system and method, and relates to the technical field of building construction. The scaffold lifting operation system comprises a master control system, a master control box, a motor power supply, branch control boxes, a notification module, a receiver, an adjusting device, an adjusting device and an input module, and the motor power source is used for providing operation power for the master control box and the branch control boxes of the whole power system. According to the scaffold lifting operation system and the method, the branch control boxes are adopted for branch control detection on a climbing frame site, safety disclosure record files are input through the master control system, lifting work is carried out after climbing frame assemblies corresponding to all the branch control boxes are detected to be qualified and technical data meet requirements, the lifting safety of climbing frame equipment is effectively guaranteed, the safety performance is improved, use is convenient, the master control system carries out overall control over the master control box and the branch control boxes, information of alternative operators is input through the input module for alternative work, the master control system carries out unified control and partition when a climbing frame device breaks down, and the alternative operator carries out emergency maintenance, so that the safety of the climbing frame device is improved.
本发明提供一种脚手架升降操作系统及其方法,涉及建筑施工技术领域,所述脚手架升降操作系统包括总控系统,主控箱,电机电源,分控箱,通知模块,接收器,调节装置,调节装置和录入模块,电机电源用于动力系统整体的主控箱与分控箱的运行动力提供,采用多个分控箱进行爬架现场的分控检测,通过总控系统进行安全交底记录文件的录入,使所有分控箱对应的爬架组件检测合格,技术资料符合要求后进行升降工作,有效保障爬架设备升降的安全性,增加安全性能,便于使用,总控系统进行主控箱和分控箱的总体控制,通过录入模块录入备选操作人员的信息进行备选工作,使爬架装置发生故障时使总控系统进行统一控制隔断,备选操作人员进行应急维修,提高爬架装置的安全性。
Scaffold lifting operation system and method
The invention provides a scaffold lifting operation system and method, and relates to the technical field of building construction. The scaffold lifting operation system comprises a master control system, a master control box, a motor power supply, branch control boxes, a notification module, a receiver, an adjusting device, an adjusting device and an input module, and the motor power source is used for providing operation power for the master control box and the branch control boxes of the whole power system. According to the scaffold lifting operation system and the method, the branch control boxes are adopted for branch control detection on a climbing frame site, safety disclosure record files are input through the master control system, lifting work is carried out after climbing frame assemblies corresponding to all the branch control boxes are detected to be qualified and technical data meet requirements, the lifting safety of climbing frame equipment is effectively guaranteed, the safety performance is improved, use is convenient, the master control system carries out overall control over the master control box and the branch control boxes, information of alternative operators is input through the input module for alternative work, the master control system carries out unified control and partition when a climbing frame device breaks down, and the alternative operator carries out emergency maintenance, so that the safety of the climbing frame device is improved.
本发明提供一种脚手架升降操作系统及其方法,涉及建筑施工技术领域,所述脚手架升降操作系统包括总控系统,主控箱,电机电源,分控箱,通知模块,接收器,调节装置,调节装置和录入模块,电机电源用于动力系统整体的主控箱与分控箱的运行动力提供,采用多个分控箱进行爬架现场的分控检测,通过总控系统进行安全交底记录文件的录入,使所有分控箱对应的爬架组件检测合格,技术资料符合要求后进行升降工作,有效保障爬架设备升降的安全性,增加安全性能,便于使用,总控系统进行主控箱和分控箱的总体控制,通过录入模块录入备选操作人员的信息进行备选工作,使爬架装置发生故障时使总控系统进行统一控制隔断,备选操作人员进行应急维修,提高爬架装置的安全性。
Scaffold lifting operation system and method
一种脚手架升降操作系统及其方法
WANG CHENGYI (Autor:in) / LIN JUNTIAN (Autor:in) / ZHANG JIMIN (Autor:in)
30.11.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste