Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the technical field of building stairs, and discloses a fabricated building temporary construction stair. The fabricated building temporary construction stair comprises a rotating mechanism, the rotating mechanism comprises a first fixing block, a sliding block is movably connected to the interior of the first fixing block, a first electromagnetic block is fixedly connected to the top end of the sliding block, the upper surface of the first electromagnetic block is movably connected with a second electromagnetic block, and the surface of the second electromagnetic block is fixedly connected with a stair plate. According to the fabricated building temporary construction stair, the first electromagnetic block and the second electromagnetic block are controlled to be attached through magnetic field attraction, the rotation angle of the stair plate can be changed, the stair plate can walk conveniently, goods can be transported conveniently, the practicability and reliability of equipment are improved, air is extruded into a connecting pipe, and therefore the air enters a sliding groove; and supporting rods are supported through pressure intensity, so that the stair plates are kept balanced, the deformation condition is improved, the situation that workers step on the stair plates and slip off is avoided, and erecting construction is easy and convenient.
本发明涉及建筑楼梯技术领域,且公开了一种装配式建筑临时施工楼梯,包括转动机构,所述转动机构包括有固定块一,所述固定块一的内部活动连接有滑块,所述滑块的顶端固定连接有电磁块一,所述电磁块一的上表面活动连接有电磁块二,所述电磁块二的表面固定连接有楼梯板。该装配式建筑临时施工楼梯,通过控制电磁块一与电磁块二通过磁场吸引进行贴合,可以改变楼梯板转动角度,使得楼梯板便于行走以及便于运输货物,提高设备的实用性以及可靠性,通过空气被挤压进入连接管,从而进入滑槽,通过压强支撑支撑杆,使得楼梯板保持平衡,改善变形的情况,避免工人踩空滑落的情况发生,搭设施工简便。
The invention relates to the technical field of building stairs, and discloses a fabricated building temporary construction stair. The fabricated building temporary construction stair comprises a rotating mechanism, the rotating mechanism comprises a first fixing block, a sliding block is movably connected to the interior of the first fixing block, a first electromagnetic block is fixedly connected to the top end of the sliding block, the upper surface of the first electromagnetic block is movably connected with a second electromagnetic block, and the surface of the second electromagnetic block is fixedly connected with a stair plate. According to the fabricated building temporary construction stair, the first electromagnetic block and the second electromagnetic block are controlled to be attached through magnetic field attraction, the rotation angle of the stair plate can be changed, the stair plate can walk conveniently, goods can be transported conveniently, the practicability and reliability of equipment are improved, air is extruded into a connecting pipe, and therefore the air enters a sliding groove; and supporting rods are supported through pressure intensity, so that the stair plates are kept balanced, the deformation condition is improved, the situation that workers step on the stair plates and slip off is avoided, and erecting construction is easy and convenient.
本发明涉及建筑楼梯技术领域,且公开了一种装配式建筑临时施工楼梯,包括转动机构,所述转动机构包括有固定块一,所述固定块一的内部活动连接有滑块,所述滑块的顶端固定连接有电磁块一,所述电磁块一的上表面活动连接有电磁块二,所述电磁块二的表面固定连接有楼梯板。该装配式建筑临时施工楼梯,通过控制电磁块一与电磁块二通过磁场吸引进行贴合,可以改变楼梯板转动角度,使得楼梯板便于行走以及便于运输货物,提高设备的实用性以及可靠性,通过空气被挤压进入连接管,从而进入滑槽,通过压强支撑支撑杆,使得楼梯板保持平衡,改善变形的情况,避免工人踩空滑落的情况发生,搭设施工简便。
Temporary stair for fabricated concrete structure and construction method of temporary stair
Europäisches Patentamt | 2022
|Fabricated stair, construction method applying fabricated stair and building structure
Europäisches Patentamt | 2022
|Fabricated permanent and temporary combined stair step template and stair construction method
Europäisches Patentamt | 2023
|Fabricated fully-prefabricated stair and fabricated stair building
Europäisches Patentamt | 2021
|