Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for planting trees on hard soil slope
The invention discloses a construction method for planting trees on a hard soil slope. The method comprises the following steps of S1, equipment assembly; S2, pore forming; S3, seedling planting; S4, curing; S5, later maintenance; a hard soil slope tree planting hole-forming drill bit and power equipment are assembled to form slope planting hole-forming complete equipment, the slope planting hole-forming complete equipment improves the traditional slope tree planting hole-forming efficiency, improves the hole-forming quality, has the advantages that the construction period investment is reduced, the construction cost is reduced, the operation is simple, and the construction is safe, the declination angle is controlled within the range of 10-15 degrees, water flow can permeate into the hole bottom, the health maintenance watering quality is improved, a water collecting groove is formed in a hole opening during planting, a notch water collecting groove is formed in the upper portion of the hole opening within the range of 30-60 degrees during planting, the depth of the notch water collecting groove is about 5 cm, flowing water collection during watering and health maintenance or flowing water collection in rainy days is facilitated, watering utilization is improved, and water is saved.
一种硬质土边坡植树施工方法,由以下步骤组成:S1、设备组装;S2、造孔;S3、苗木栽植;S4、养生;S5、后期维护;本发明采用一种硬质土边坡植树造孔钻头和动力设备组装形成坡面栽植造穴成套设备,应用本装置提高了传统边坡植树造穴效率,提高了造穴质量,具有减少工期的投入、降低了施工成本、操作简单、施工安全的优点,通过对造孔角度控制,下倾角度控制在10°~15°范围,有利水流渗入孔底,提高了养生浇水质量,栽植时在孔口形成集水槽,栽植时在穴口上部30°~60°范围开挖形成豁口集水槽,深度5cm左右,有利浇水养生时流水收集或雨天时流水收集,提高了浇水利用、节约了用水。
Construction method for planting trees on hard soil slope
The invention discloses a construction method for planting trees on a hard soil slope. The method comprises the following steps of S1, equipment assembly; S2, pore forming; S3, seedling planting; S4, curing; S5, later maintenance; a hard soil slope tree planting hole-forming drill bit and power equipment are assembled to form slope planting hole-forming complete equipment, the slope planting hole-forming complete equipment improves the traditional slope tree planting hole-forming efficiency, improves the hole-forming quality, has the advantages that the construction period investment is reduced, the construction cost is reduced, the operation is simple, and the construction is safe, the declination angle is controlled within the range of 10-15 degrees, water flow can permeate into the hole bottom, the health maintenance watering quality is improved, a water collecting groove is formed in a hole opening during planting, a notch water collecting groove is formed in the upper portion of the hole opening within the range of 30-60 degrees during planting, the depth of the notch water collecting groove is about 5 cm, flowing water collection during watering and health maintenance or flowing water collection in rainy days is facilitated, watering utilization is improved, and water is saved.
一种硬质土边坡植树施工方法,由以下步骤组成:S1、设备组装;S2、造孔;S3、苗木栽植;S4、养生;S5、后期维护;本发明采用一种硬质土边坡植树造孔钻头和动力设备组装形成坡面栽植造穴成套设备,应用本装置提高了传统边坡植树造穴效率,提高了造穴质量,具有减少工期的投入、降低了施工成本、操作简单、施工安全的优点,通过对造孔角度控制,下倾角度控制在10°~15°范围,有利水流渗入孔底,提高了养生浇水质量,栽植时在孔口形成集水槽,栽植时在穴口上部30°~60°范围开挖形成豁口集水槽,深度5cm左右,有利浇水养生时流水收集或雨天时流水收集,提高了浇水利用、节约了用水。
Construction method for planting trees on hard soil slope
一种硬质土边坡植树施工方法
GUO XIAOFENG (Autor:in) / ZHANG BO (Autor:in) / ZHANG LEI (Autor:in) / YANG YUNHUI (Autor:in) / ZHANG XIAODI (Autor:in) / WU FUJUN (Autor:in) / LI ZHAOZHAO (Autor:in) / WEI CUIXIA (Autor:in) / MA RUINING (Autor:in)
10.12.2021
Patent
Elektronische Ressource
Chinesisch
Construction method of soil bag slope using a planting net box
Europäisches Patentamt | 2022
|Slope field soil rainwater utilization planting method
Europäisches Patentamt | 2025
|Construction method of planting concrete ecological slope protection
Europäisches Patentamt | 2020
|Construction method for combining lattice beams with planting grooves on high soil slope
Europäisches Patentamt | 2021
|Concrete plant planting and slope protecting method for soft soil river slope
Europäisches Patentamt | 2015
|