Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated municipal drainage inspection well and using method thereof
The invention relates to a prefabricated municipal drainage inspection well. The top of the inspection well is rotationally connected with a well lid, the sides, away from each other, of the inspection well are provided with first water inlet pipes which communicate with each other, and the sides, away from each other, of the inspection well are provided with a second water inlet pipe and a water outlet pipe which communicate with each other correspondingly; first baffles are slidably connected to the inner walls of the sides, away from each other, of inspection wells, second baffles are slidably connected to the inner walls of the sides, close to the second water inlet pipe, of the inspection wells, and sliding assemblies are arranged on the inner walls of the sides of the inspection wells, and a first sliding plate is slidably connected in a deposition tank at the bottom of the inspection well; a rotating shaft penetrating through the top of the first sliding plate is rotationally connected to the inner wall of the bottom of the deposition tank, a reciprocating assembly is arranged in the deposition tank, and a plurality of fan blades are arranged on the outer wall of a round sleeve at the top end of the rotating shaft at equal intervals, and a fixing asembly is arranged in the rotating shaft. According to the prefabricated municipal drainage inspection well and a using method thereof, the problems that in an existing inspection well, the water flow velocity of the water inlet pipe is uncontrollable, silt is prone to deposition and inconvenient to clean, circulation of rainwater and sewage in the inspection well is affected, and maintenance is inconvenient for maintainers are solved.
本发明涉及一种预制装配式市政排水检查井,检查井的顶部转动连接有井盖,检查井相互远离的一侧均设有相连通的第一进水管,检查井相互远离的一侧分别设有相连通的第二进水管和出水管,检查井相互远离的一侧内壁均滑动连接有第一挡板,检查井靠近第二进水管的一侧内壁滑动连接有第二挡板,检查井的一侧内壁设有滑动组件,检查井底部沉积槽内滑动连接有第一滑板,沉积槽的底部内壁转动连接有贯穿第一滑板顶部的转轴,沉积槽内设有往复组件,转轴顶端圆套外壁等距设有多个扇叶,转轴内设有固定组件;解决现有检查井中进水管水流流速不可控,泥沙容易沉积,不方便对泥沙进行清理,影响检查井中雨污水流通且不方便检修人员检修的问题。
Prefabricated municipal drainage inspection well and using method thereof
The invention relates to a prefabricated municipal drainage inspection well. The top of the inspection well is rotationally connected with a well lid, the sides, away from each other, of the inspection well are provided with first water inlet pipes which communicate with each other, and the sides, away from each other, of the inspection well are provided with a second water inlet pipe and a water outlet pipe which communicate with each other correspondingly; first baffles are slidably connected to the inner walls of the sides, away from each other, of inspection wells, second baffles are slidably connected to the inner walls of the sides, close to the second water inlet pipe, of the inspection wells, and sliding assemblies are arranged on the inner walls of the sides of the inspection wells, and a first sliding plate is slidably connected in a deposition tank at the bottom of the inspection well; a rotating shaft penetrating through the top of the first sliding plate is rotationally connected to the inner wall of the bottom of the deposition tank, a reciprocating assembly is arranged in the deposition tank, and a plurality of fan blades are arranged on the outer wall of a round sleeve at the top end of the rotating shaft at equal intervals, and a fixing asembly is arranged in the rotating shaft. According to the prefabricated municipal drainage inspection well and a using method thereof, the problems that in an existing inspection well, the water flow velocity of the water inlet pipe is uncontrollable, silt is prone to deposition and inconvenient to clean, circulation of rainwater and sewage in the inspection well is affected, and maintenance is inconvenient for maintainers are solved.
本发明涉及一种预制装配式市政排水检查井,检查井的顶部转动连接有井盖,检查井相互远离的一侧均设有相连通的第一进水管,检查井相互远离的一侧分别设有相连通的第二进水管和出水管,检查井相互远离的一侧内壁均滑动连接有第一挡板,检查井靠近第二进水管的一侧内壁滑动连接有第二挡板,检查井的一侧内壁设有滑动组件,检查井底部沉积槽内滑动连接有第一滑板,沉积槽的底部内壁转动连接有贯穿第一滑板顶部的转轴,沉积槽内设有往复组件,转轴顶端圆套外壁等距设有多个扇叶,转轴内设有固定组件;解决现有检查井中进水管水流流速不可控,泥沙容易沉积,不方便对泥沙进行清理,影响检查井中雨污水流通且不方便检修人员检修的问题。
Prefabricated municipal drainage inspection well and using method thereof
一种预制装配式市政排水检查井及其使用方法
LIU YUFENG (Autor:in) / LI QIULAN (Autor:in)
10.12.2021
Patent
Elektronische Ressource
Chinesisch
Fabricated type prefabricated water drainage inspection well and construction method thereof
Europäisches Patentamt | 2020
|High-strength prefabricated inspection well for municipal engineering
Europäisches Patentamt | 2023
|Novel prefabricated inspection well and drainage pipeline system
Europäisches Patentamt | 2024
|