Installation and construction method for high-altitude large-span steel corridor curtain wall
The invention discloses an installation and construction method for a high-altitude large-span steel corridor curtain wall. The construction method comprises the following steps that S1, steel corridor splicing preparation is conducted; S2, the steel corridor is subjected to bed-jig separation; S3, initial lifting of the steel corridor is conducted; S4, a suspended ceiling of the steel corridor is installed; S5, formally lifting is conducted the steel corridor; S6, the steel corridor is lifted in place; S7, a hanging basket is installed; S8, curtain wall installation is conducted; S9, a hanging basket bracket is uninstalled; and S10, the cover plate of the steel corridor is installed. According to the installation and construction method, steel corridor lifting and curtain wall construction are combined in order, and the method is suitable for curtain wall installation construction of high-altitude and large-span steel corridor overall lifting, efficient and safe, and has high practicability and better application prospects.
本发明公开了一种高空大跨度钢连廊幕墙安装施工方法,包括如下步骤:S1钢连廊拼装准备;S2钢连廊脱胎;S3钢连廊初提;S4钢连廊吊顶安装;S5钢连廊正式提升;S6钢连廊提升就位;S7吊篮安装;S8幕墙安装;S9吊篮支架拆除;S10钢连廊盖板安装。本发明将钢连廊提升与幕墙施工有序结合,适用于高空、大跨度钢连廊整体提升的幕墙安装施工,高效安全,具有较强的实用性和较好的应用前景。
Installation and construction method for high-altitude large-span steel corridor curtain wall
The invention discloses an installation and construction method for a high-altitude large-span steel corridor curtain wall. The construction method comprises the following steps that S1, steel corridor splicing preparation is conducted; S2, the steel corridor is subjected to bed-jig separation; S3, initial lifting of the steel corridor is conducted; S4, a suspended ceiling of the steel corridor is installed; S5, formally lifting is conducted the steel corridor; S6, the steel corridor is lifted in place; S7, a hanging basket is installed; S8, curtain wall installation is conducted; S9, a hanging basket bracket is uninstalled; and S10, the cover plate of the steel corridor is installed. According to the installation and construction method, steel corridor lifting and curtain wall construction are combined in order, and the method is suitable for curtain wall installation construction of high-altitude and large-span steel corridor overall lifting, efficient and safe, and has high practicability and better application prospects.
本发明公开了一种高空大跨度钢连廊幕墙安装施工方法,包括如下步骤:S1钢连廊拼装准备;S2钢连廊脱胎;S3钢连廊初提;S4钢连廊吊顶安装;S5钢连廊正式提升;S6钢连廊提升就位;S7吊篮安装;S8幕墙安装;S9吊篮支架拆除;S10钢连廊盖板安装。本发明将钢连廊提升与幕墙施工有序结合,适用于高空、大跨度钢连廊整体提升的幕墙安装施工,高效安全,具有较强的实用性和较好的应用前景。
Installation and construction method for high-altitude large-span steel corridor curtain wall
一种高空大跨度钢连廊幕墙安装施工方法
QIAO XIAOMING (Autor:in) / DING SHOUMING (Autor:in) / QIAN YUANDI (Autor:in) / JIN RENCAI (Autor:in) / NIAN FAN (Autor:in)
10.12.2021
Patent
Elektronische Ressource
Chinesisch
Large-span high-altitude corridor curtain wall construction operation platform
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|Splicing construction method for high-altitude large-span steel structure corridor
Europäisches Patentamt | 2024
|Construction method for combining high-altitude profile steel corridor and curtain wall
Europäisches Patentamt | 2024
|Method for installing curtain wall at bottom of large-span steel corridor