Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stay cable anti-corrosion protective sleeve and operation method
The invention discloses a stay cable anti-corrosion protective sleeve and an operation method, and belongs to the technical field of various stay cable bridge engineering construction. The protective sleeve comprises a protective sleeve body and hanging brackets, the outer wall of the bottom of each hanging bracket is fixedly connected with a hanging rope, the outer wall of the bottom of each hanging rope is fixedly connected with an impact ball, and through the arrangement of the hanging brackets, the hanging ropes, the impact balls and auxiliary impact blocks, after the protective sleeve body is installed, the protective sleeve body is located in the external environment; external rainwater drops on the outer wall of the protective sleeve body, and wind power impacts a lifting rope, so that the lifting rope drives an impact ball and an auxiliary impact block to impact the outer wall of the protective sleeve body, and the rainwater attached to the outer wall of the protective sleeve body falls off; and corrosion of the protective sleeve body caused by sliding of rainwater attached to the outer wall of the protective sleeve body is avoided, the service life of the protective sleeve body is prolonged in this way, and then the anti-corrosion protection effect of the stay cable is improved.
本发明公开了一种斜拉索防腐保护套及操作方法,属于各类斜拉索桥梁工程施工技术领域。本发明包括保护套本体和吊架,每个所述吊架的底部外壁均固定连接有吊绳,且每个吊绳的底部外壁均固定连接有撞击球,本发明通过设置有吊架、吊绳、撞击球和辅助撞击块,保护套本体安装后,其位于外界环境下,外界的雨水滴落在保护套本体的外壁,风力对吊绳进行冲击,使得吊绳带动撞击球和辅助撞击块对保护套本体的外壁进行撞击,从而使得保护套本体外壁附着的雨水脱落,避免雨水依附于保护套本体的外壁进行滑动造成保护套本体的腐蚀,通过该种方式延长保护套本体的使用寿命,继而提高斜拉索的防腐保护效果。
Stay cable anti-corrosion protective sleeve and operation method
The invention discloses a stay cable anti-corrosion protective sleeve and an operation method, and belongs to the technical field of various stay cable bridge engineering construction. The protective sleeve comprises a protective sleeve body and hanging brackets, the outer wall of the bottom of each hanging bracket is fixedly connected with a hanging rope, the outer wall of the bottom of each hanging rope is fixedly connected with an impact ball, and through the arrangement of the hanging brackets, the hanging ropes, the impact balls and auxiliary impact blocks, after the protective sleeve body is installed, the protective sleeve body is located in the external environment; external rainwater drops on the outer wall of the protective sleeve body, and wind power impacts a lifting rope, so that the lifting rope drives an impact ball and an auxiliary impact block to impact the outer wall of the protective sleeve body, and the rainwater attached to the outer wall of the protective sleeve body falls off; and corrosion of the protective sleeve body caused by sliding of rainwater attached to the outer wall of the protective sleeve body is avoided, the service life of the protective sleeve body is prolonged in this way, and then the anti-corrosion protection effect of the stay cable is improved.
本发明公开了一种斜拉索防腐保护套及操作方法,属于各类斜拉索桥梁工程施工技术领域。本发明包括保护套本体和吊架,每个所述吊架的底部外壁均固定连接有吊绳,且每个吊绳的底部外壁均固定连接有撞击球,本发明通过设置有吊架、吊绳、撞击球和辅助撞击块,保护套本体安装后,其位于外界环境下,外界的雨水滴落在保护套本体的外壁,风力对吊绳进行冲击,使得吊绳带动撞击球和辅助撞击块对保护套本体的外壁进行撞击,从而使得保护套本体外壁附着的雨水脱落,避免雨水依附于保护套本体的外壁进行滑动造成保护套本体的腐蚀,通过该种方式延长保护套本体的使用寿命,继而提高斜拉索的防腐保护效果。
Stay cable anti-corrosion protective sleeve and operation method
一种斜拉索防腐保护套及操作方法
WANG HAN (Autor:in) / ZHAO HAIFENG (Autor:in)
17.12.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Application and Assessment of Anti-corrosion Technologies for Stay-cable
British Library Online Contents | 2003
|Sliding hanging basket for repairing and cleaning stay cable sleeve of cable-stayed bridge
Europäisches Patentamt | 2021
|Steel strand stay cable HDPE outer sleeve jacking device and using method thereof
Europäisches Patentamt | 2023
|Positioning device for installation of cable protective sleeve
Europäisches Patentamt | 2020
|