Top soil-piled mountain-shaped structure construction method
The invention relates to a top soil-piled mountain-shaped structure construction method. The construction method comprises the following steps of a, construction preparation; b, primary structure construction; c, secondary structure construction: firstly building a bracket on a primary structure, then building a tapered plane beam, a tapered plane roof and a conversion column structure template of a secondary structure according to the design scheme, reserving a hoisting opening in the tapered plane roof template, then pouring concrete, removing the template and the bracket after the strength of a concrete structure meets the requirement, transferring the f template and the bracket out of the construction area from the reserved hoisting opening, and then closing the hoisting opening; d, constructing a retaining wall; e, soil piling construction; and f, ending and complementing. When the secondary structure construction is carried out, the template and the bracket are convenient to dismantle by reserving the hoisting opening, the dismantled template and the dismantled bracket can be hoisted out of the hoisting opening, construction tools such as the template and the bracket can be repeatedly used, loss and waste of the construction tools are reduced, and the requirement for sustainable development is met.
本申请涉及顶部堆土山形结构施工方法,其包括以下步骤:a.施工准备;b.一次结构施工;c.二次结构施工:先在一次结构上搭建支架,然后根据设计方案搭建二次结构的斜平面梁、斜平面屋盖、转换柱结构模板,并在斜平面屋盖模板上预留吊装口,之后浇筑混凝土,待混凝土结构强度满足要求后,拆除模板和支架,将模板及支架从预留的吊装口运出该施工区域,之后再封闭吊装口;d.挡土墙施工;e.堆土施工;f.收尾补全。本申请在进行二次结构施工时,通过预留吊装口,方便进行模板和支架的拆除工作,且拆除后的模板和支架可从吊装口吊出,使得模板和支架等施工器具能够重复使用,减少建筑器具的损失浪费,满足可持续发展的要求。
Top soil-piled mountain-shaped structure construction method
The invention relates to a top soil-piled mountain-shaped structure construction method. The construction method comprises the following steps of a, construction preparation; b, primary structure construction; c, secondary structure construction: firstly building a bracket on a primary structure, then building a tapered plane beam, a tapered plane roof and a conversion column structure template of a secondary structure according to the design scheme, reserving a hoisting opening in the tapered plane roof template, then pouring concrete, removing the template and the bracket after the strength of a concrete structure meets the requirement, transferring the f template and the bracket out of the construction area from the reserved hoisting opening, and then closing the hoisting opening; d, constructing a retaining wall; e, soil piling construction; and f, ending and complementing. When the secondary structure construction is carried out, the template and the bracket are convenient to dismantle by reserving the hoisting opening, the dismantled template and the dismantled bracket can be hoisted out of the hoisting opening, construction tools such as the template and the bracket can be repeatedly used, loss and waste of the construction tools are reduced, and the requirement for sustainable development is met.
本申请涉及顶部堆土山形结构施工方法,其包括以下步骤:a.施工准备;b.一次结构施工;c.二次结构施工:先在一次结构上搭建支架,然后根据设计方案搭建二次结构的斜平面梁、斜平面屋盖、转换柱结构模板,并在斜平面屋盖模板上预留吊装口,之后浇筑混凝土,待混凝土结构强度满足要求后,拆除模板和支架,将模板及支架从预留的吊装口运出该施工区域,之后再封闭吊装口;d.挡土墙施工;e.堆土施工;f.收尾补全。本申请在进行二次结构施工时,通过预留吊装口,方便进行模板和支架的拆除工作,且拆除后的模板和支架可从吊装口吊出,使得模板和支架等施工器具能够重复使用,减少建筑器具的损失浪费,满足可持续发展的要求。
Top soil-piled mountain-shaped structure construction method
顶部堆土山形结构施工方法
XU LEI (Autor:in) / ZHANG YIZHOU (Autor:in) / LIU CHENCHEN (Autor:in)
21.12.2021
Patent
Elektronische Ressource
Chinesisch
Top soil-piled mountain-shaped building roof structure and method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|Collaborative utilization method of construction waste in piled mountain landscaping engineering
Europäisches Patentamt | 2020
|Conventional and Box-Shaped Piled Rafts
British Library Conference Proceedings | 2002
|Novel piled anchor supporting structure and construction method
Europäisches Patentamt | 2024
|