One-time pouring construction method for toilet flashing along with main body
The invention relates to a one-time pouring construction method for a toilet flashing along with a main body, and belongs to the technical field of building construction. The one-time pouring construction method comprises the following methods of S1, formwork processing; S2, measuring and positioning; S3, installing and fixing formworks; S4, pouring and forming concrete; and S5, dismantling the formworks; and the formwork in the step S1 is a bamboo plywood with the thickness of 14 millimeters, the formworks comprise a first side formwork, a second side formwork and a third side formwork, the height of the first side formwork on the inner side of a toilet is equal to the sum of the height of a descending plate and the height of the flashing, and the height of the third side formwork on the outer side of the toilet is equal to the height of the flashing. According to the one-time pouring construction method, the bamboo plywood with the thickness of 14 millimeters is used as the formworks, the square timber and detachable water stop bolts are used as reinforcing materials for conducting finalization installation and reinforcement, construction operation is easy, the construction cost is low, the construction reinforcing materials are easy to obtain locally, the formworks can be repeatedly used, and economic benefits are obvious.
本发明涉及一种卫生间反坎随主体一次性浇筑施工方法,属于建筑施工技术领域,包括以下步骤:S1、模板加工;S2、测量定位;S3、模板安装固定;S4、混凝土浇筑成型;S5、模板拆除;S1中模板为14mm厚竹胶板,所述模板包括第一侧模、第二侧模和第三侧模,其中,卫生间内侧的第一侧模高度等于降板高度加上反坎高度,卫生间外侧的第三侧模高度为反坎高度。本发明利用14mm厚竹胶板作为模板,方木和可拆卸止水螺栓作为加固材料进行定型化安装加固,施工操作简单,施工成本低,施工加固材料易就地取材,模板可多次重复使用,经济效益明显。
One-time pouring construction method for toilet flashing along with main body
The invention relates to a one-time pouring construction method for a toilet flashing along with a main body, and belongs to the technical field of building construction. The one-time pouring construction method comprises the following methods of S1, formwork processing; S2, measuring and positioning; S3, installing and fixing formworks; S4, pouring and forming concrete; and S5, dismantling the formworks; and the formwork in the step S1 is a bamboo plywood with the thickness of 14 millimeters, the formworks comprise a first side formwork, a second side formwork and a third side formwork, the height of the first side formwork on the inner side of a toilet is equal to the sum of the height of a descending plate and the height of the flashing, and the height of the third side formwork on the outer side of the toilet is equal to the height of the flashing. According to the one-time pouring construction method, the bamboo plywood with the thickness of 14 millimeters is used as the formworks, the square timber and detachable water stop bolts are used as reinforcing materials for conducting finalization installation and reinforcement, construction operation is easy, the construction cost is low, the construction reinforcing materials are easy to obtain locally, the formworks can be repeatedly used, and economic benefits are obvious.
本发明涉及一种卫生间反坎随主体一次性浇筑施工方法,属于建筑施工技术领域,包括以下步骤:S1、模板加工;S2、测量定位;S3、模板安装固定;S4、混凝土浇筑成型;S5、模板拆除;S1中模板为14mm厚竹胶板,所述模板包括第一侧模、第二侧模和第三侧模,其中,卫生间内侧的第一侧模高度等于降板高度加上反坎高度,卫生间外侧的第三侧模高度为反坎高度。本发明利用14mm厚竹胶板作为模板,方木和可拆卸止水螺栓作为加固材料进行定型化安装加固,施工操作简单,施工成本低,施工加固材料易就地取材,模板可多次重复使用,经济效益明显。
One-time pouring construction method for toilet flashing along with main body
一种卫生间反坎随主体一次性浇筑施工方法
WAN YUAN (Autor:in) / YANG XIAOHUI (Autor:in) / TIAN XIAOLU (Autor:in) / WANG QIANG (Autor:in) / LI KUI (Autor:in) / ZHONG LEI (Autor:in) / WANG ZHIGANG (Autor:in) / MA YONGXIAN (Autor:in) / YANG TAO (Autor:in)
21.12.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
One-time pouring construction method for waterproof reverse ridge of toilet and main building
Europäisches Patentamt | 2021
|Concrete pouring equipment for reinforced concrete main body construction
Europäisches Patentamt | 2023
|